Orange County NC Website
DocuSign Envelope ID:46EEBC6C-B5CA-44D3-867D-F42A6EFOC768 <br /> SIEMENS <br /> Building Automation <br /> Siemens Industry, Inc. <br /> Brian Fleischhauer <br /> 215 Southport dr. <br /> Suite 900 <br /> Morrisville NC 27597 <br /> 919-465-5216 <br /> 919-539-5804 <br /> bria n.Tleischh a ue r(W sieme n s.co m <br /> Date 10/1812018 <br /> Orange Co.-Office Building VFD Replacement <br /> Payment Net 30 <br /> Terms <br /> Attention: Dustin Bryant/Paul Sorrell Proposal Valid <br /> Until 12/1812018 <br /> Statement of Work: Office AHU#3 VFD Replacement <br /> Siemens will provide: (1)15HP BT300 VFD w/Conven tio nal Bypass;480V;TYPE3R Enclosure. <br /> Labor to perform factory startup of the VFD and submit warranty paperwork. <br /> Demo,install and terminations of the VFD. <br /> Miscellaneous materials for terminations and connections within enclosure, <br /> Controls wiring disconnections and reconnections. <br /> Note:This VFD reportedly failed during Hurricane Michael. <br /> Clarifications: <br /> This proposal is for labor and material,taxes are excluded. <br /> Unit will need to be scheduled down for the day in order to switch out the VFD. <br /> Orange County Staff to coordinate with building occupants and Siemens on the implementation schedule. <br /> Insulation,patch,paint is excluded. <br /> All work will be performed during normal business hours(M-F,8:00-5:00) <br /> Total Quote Price $6,888 <br /> Applicable sales taxes are nol included In this proposal Sales lax will be billed at the Uwe of Invoking and required by state law. <br /> Slemens standard Terms&Conditions are applicable to naffs proposal.If this proposal addresses a Change order to an exlsling project,the Terms& <br /> Conditions in effect for the eyismg contract&Project(referenced above)are applicabfa to work covered by this proposal.Any mo lifimOms to either <br /> Terms&conditions formal.,or project related circumstances anecting Siamans ability to efficiently execute Ihls work as planned,that become evident <br /> after the dale of Ihls proposal,will cause us to re-evaluate our costs of implementation.If that exerelse mr1 kates a cost change to Siemens,we reserve <br /> the righl to requata this vrcrk to reflect the Impact of(hose altered lob corrditicns. <br /> CUSTOMER REPRESENTATIVE C e ed <br /> Siemens Industry,Inc- <br /> By: By: Siemens idustry,Inc. <br /> Name: Name: Brian Fleischhauer <br /> Title: Title: Service Account Engineer <br /> Date: Date: 18-Oct-18 <br />