Browse
Search
2018-704-E AMS - Summit Design freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-704-E AMS - Summit Design freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 1:59:20 PM
Creation date
10/29/2018 1:12:14 PM
Metadata
Fields
Template:
Contract
Date
8/20/2018
Contract Starting Date
8/20/2018
Contract Document Type
Agreement - Consulting
Amount
$10,750.00
Document Relationships
2019-797-E AMS - Summit Design contract amendment PFAP freezer installation
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-704 AMS - Summit Design freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />March 16, 2018 (EXHIBIT A) <br />Revised: 7/9/18; 7/12/18 <br /> <br />Piedmont Food & Ag Processing Center <br />Attn: Eric Hallman <br />500 Valley Forge Road <br />Hillsborough, NC 27278 <br /> <br /> <br />Re: Piedmont Food & Ag – Freezer Addition <br /> Orange County Tax Parcel PIN 9874315787 <br /> <br />Dear Mr. Hallman: <br /> <br />SUMMIT is pleased with the opportunity to provide this scope and fee proposal for consulting <br />services for the proposed improvements and new construction at the Piedmont Food & Ag <br />Processing Center on Valley Forge Rd. in Hillsborough, NC. It is our understanding that you are <br />proposing to add a Freezer facility on the east side of the existing building. It is also our <br />understanding that to obtain approval from the Town of Hillsborough for this work that a Zoning <br />Compliance Permit will need to be submitted, reviewed and approved by the Town. We propose <br />to provide the nessesary site Civil and Structural Engineering design drawings and details for <br />these improvements and our proposed full Scope of Work for this project is outlined in the <br />following sections of our proposal. We look forward to working with you to help meet the needs <br />and goals of your business. <br /> <br /> <br /> <br />SCOPE OF WORK <br />Task 1A – Zoning Compliance Permit (ZCP) Site Plan Design Drawings: <br />For the proposed site modification to add the Nitrogen Tank and Freezer expansion SUMMIT <br />will prepare a Plot Plan design drawing in accordance with the requirements of Appendix G <br />of the Town of Hillsborough UDO. This drawing will be included with the ZCP application <br />submittal package as outlined under Task 3 (Permitting and Applications) below. The Plot <br />Plan drawing will include the items as noted under the provisions of Appendix G including <br />property lines and dimensions, existing and proposed structures, offset dimensions of the <br />structures to the property line, streams, creeks and ponds and all other site improvements <br />on the property. (Sidewalks, Drives, Parking, etc.) <br />DocuSign Envelope ID: 3BB200F6-4761-46CD-8B69-0FE9970D5654
The URL can be used to link to this page
Your browser does not support the video tag.