Browse
Search
2018-704-E AMS - Summit Design freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-704-E AMS - Summit Design freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 1:59:20 PM
Creation date
10/29/2018 1:12:14 PM
Metadata
Fields
Template:
Contract
Date
8/20/2018
Contract Starting Date
8/20/2018
Contract Document Type
Agreement - Consulting
Amount
$10,750.00
Document Relationships
2019-797-E AMS - Summit Design contract amendment PFAP freezer installation
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-704 AMS - Summit Design freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 3 – Permitting and Applications: <br />We anticipate that the following permits will be required for this project and SUMMIT will <br />prepare and submit the applications to be reviewed by each authority. The scope of this task <br />also includes plan/application revisions as may be requested from each authority for minor <br />changes to the plans and documents. Any major changes or requests will be done on a time- <br />and-material basis according to the attached Schedule of Standard Rates: <br /> <br />x Town of Hillsborough Zoning Compliance Permit <br />o SUMMIT will prepare and submit the required ZCP permit application and <br />supporting documents to the Town of Hillsborough Planning Department. <br /> <br /> <br />Task 4 – Opinion of Probable Cost (OPC): <br />Upon acceptance of the Final Concept Plan by the owner/client, SUMMIT will prepare an <br />Engineer’s Estimate/Opinion of Probable Cost (OPC) for the proposed development. This <br />OPC will be based upon the best assumptions that can be made from the Concept Plan at <br />that time. The OPC will be made with the best information available at the time for <br />construction materials and labor costs. <br /> <br /> <br />Task 5 – Hourly Services: <br />Open task to address any additional miscellaneous services that may be required, additional <br />meetings with the client or regulatory agencies or other items beyond the scope of work in <br />Items 1-4. <br /> <br />ASSUMPTIONS & EXCLUSIONS: <br />x Additional services outside this scope of services will be provided if requested by the <br />client for a negotiated lump sum fee or at our standard hourly billing rates under the <br />provisions of Task 5. <br />x This proposal is for the scope of work as specifically outlined in Tasks 1-4 above for the <br />project design and permit approvals only. <br />x This proposal is based upon receipt of a CAD file from the prior Engineering design firm <br />for the project. (CAD file was received on 3/12/2018) <br /> <br />CLIENT RESPONSIBILITIES: <br />It shall be the responsibility of the Client to provide the following items: <br />1. Access to the site. <br />2. Decisions on critical design issues as necessary in a timely manner. <br />3. Payment of all invoices per conditions of the agreement. <br />4. Client/Owner to be responsible for the payment of all regulatory agency fees for plan <br />reviews and permitting, etc. <br />DocuSign Envelope ID: 3BB200F6-4761-46CD-8B69-0FE9970D5654
The URL can be used to link to this page
Your browser does not support the video tag.