Browse
Search
2018-704-E AMS - Summit Design freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-704-E AMS - Summit Design freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 1:59:20 PM
Creation date
10/29/2018 1:12:14 PM
Metadata
Fields
Template:
Contract
Date
8/20/2018
Contract Starting Date
8/20/2018
Contract Document Type
Agreement - Consulting
Amount
$10,750.00
Document Relationships
2019-797-E AMS - Summit Design contract amendment PFAP freezer installation
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-704 AMS - Summit Design freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />For the Plot Plan Design the following deliverables are to be provided by SUMMIT with this <br />scope: <br /> <br />Deliverables: <br />1. Cover Sheet <br />2. Existing Conditions Plan sheet <br />3. Plot Plan Sheet <br />4. Site Details Sheet <br /> <br /> <br />Task 1B – Structural Engineering Services: <br />For this project we propose providing the following structural engineering services: <br /> <br />x Research pre-fabricated freezer system (in particular floor insulation systems) <br />x Design a new structural retaining wall type foundation system for the proposed two <br />side-by-side 15’-6” x 20’ x 8’ H exterior freezer boxes. <br />x Provide structural plans and details suitable for permitting and construction of <br />foundation system <br />x Provide note form specifications on the drawings <br />x Provide 2 site visits during construction, to review the footing reinforcement before <br />concrete placement, and to review the wall reinforcement before concrete <br />placement. <br /> <br /> <br />Task 1C – Electrical Engineering Services: <br />For this project we propose providing the following electrical engineering services: <br /> <br />x Provide an assessment of the load requirements for the proposed new side-by-side <br />freezer installation, to determine if the existing freezer electrical service is <br />sufficient. <br />x Provide design for connection to existing service if practical, or a new design for <br />service connection if needed. <br /> <br /> <br /> Task 2 – ZCP Review Process: <br />SUMMIT will follow up with the Town of Hillsborough Planning Director and/or staff to obtain <br />receipt of comments from the Technical Review Committee and other departmental staff. Upon <br />receipt of the review letter and comments, SUMMIT will prepare one (1) set of revised plans <br />and comment responses and submit back to the Town of Hillsborough for action. The scope of <br />work for this Task will include attendance at one (1) TRC meeting. Any additional meetings or <br />revisions required for subsequent review cycles will be done on a time-and-material basis <br />according to the attached Schedule of Standard Rates. <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 3BB200F6-4761-46CD-8B69-0FE9970D5654
The URL can be used to link to this page
Your browser does not support the video tag.