Browse
Search
Agenda - 10-25-2018 Abstract for Joint Meeting Discussion Items
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 10-25-2018 Carrboro
>
Agenda - 10-25-2018 Abstract for Joint Meeting Discussion Items
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 10:07:09 AM
Creation date
10/22/2018 9:58:37 AM
Metadata
Fields
Template:
BOCC
Date
10/25/2018
Meeting Type
Municipalities
Document Type
Agenda
Document Relationships
Agenda - 10-25-2018 Joint Meeting with Carrboro
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 10-25-2018 Carrboro
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> Exhibit B—Sustainable Design and Operations Elements Guidelines <br /> The Development Agreement recognizes the goals of Orange County and the Town of Carrboro <br /> to be guided by design and operations elements of the High Performance Building Standards <br /> developed by the Triangle J Council of Governments ("TJCOG") in 2001. Orange County <br /> adopted this standard as part of its Space Development criteria in 2005. <br /> These High Performance Building Standards were initially developed by a task force led by <br /> TJCOG, including representatives from Orange County, and design professionals within the <br /> Triangle Area. These published guidelines have been nationally recognized and formed the <br /> basis for the Leadership in Energy and Environmental Design ("LEED")version ll, established by <br /> the United States Green Building Council ("USGBC"). The standards are recognized for their <br /> innovation and quality of results related to sustainable, energy efficient, and resilient building <br /> outcomes. <br /> Orange County and Carrboro recognize the current initiative to update these guidelines <br /> consistent with current benchmarks and advances in design and building science. Sustainable <br /> design, construction and operations methods will be evident within the design and build <br /> process and will be explicitly communicated throughout the development process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.