Browse
Search
Agenda - 06-23-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 06-23-2004
>
Agenda - 06-23-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:03:41 PM
Creation date
8/29/2008 10:22:50 AM
Metadata
Fields
Template:
BOCC
Date
6/23/2004
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20040623
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D (sub-attachment) <br />~9 <br />• Flush the buildi:,g with 100% filtered and conditioned air for a period of not less than 30 days prior <br />to occupancy as schedule pentits <br />6.6 L.ow-emitting 1\laterials <br />• Meet or exceed VQC limits for adhesives, sealants, paints, carpets and composite wood products <br />using the following guidelines <br />• South Coast Air Quality Management Rule #1168 <br />• Bay Area ,qtr Resources, Reg.8 Rule 51 <br />• Green Seal requirements <br />• Carpet and Rug Institute Green Label program <br />6.7 Indoor Chemical and Pollutants <br />- Design to minimize cross contamina?ten of regularly occupied areas by using grates and grills for <br />dirt and particulate <br />• Separate outside exhausts so that no air recirculation occurs from custodial, laboratory or <br />copying/printing rooms take place <br />• Provide appropriate drainage systems for liquid waste <br />• Implement and insure good housekeeping processes within the building <br />6.8 S} stem Control <br />• Provide one operable window and one lighting control panel per 200 square feet for all occupied <br />areas <br />• Provide controls for individual airflow, temperature and lighting for regularly occupied areas to <br />teachers and staff within accepted parameters <br />6.9 Thermal Comfort <br />• Comply with ASHRAE Standard 55-1992, addenda ] 99~ for thermal comfort standards <br />• Provide permanent temperature and humidity monitoring to allow operators to control and adjust <br />performance <br />6.10 Daylighting and Vie~cs <br />• Achieve a minimum Daylight Factor of 2% without creating cooling problems due to excessive <br />glazing, in 7~°./° of'all space occupied for critical visual tasks excluding low occupancy support areas <br />• Achieve a direct lire of sight to the exterior from 90% of ail regularly occupied spaces <br />6.11 Contaminant Monitoring <br />• Explore installation of independent monitoring systems for ozone, radon, nitric oxide, sulfiir <br />dioxide or fungus and mold <br />6.12 Acoustic Quality <br />' ...: ]tln_I:_~.T11_CAGCn"T O.]_~.L_10.:_L1.... . ,'n n~.....-. -. . <br />L.- a .~ t ~ .. L..' t'.. ,__. __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.