Browse
Search
Agenda - 06-23-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 06-23-2004
>
Agenda - 06-23-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:03:41 PM
Creation date
8/29/2008 10:22:50 AM
Metadata
Fields
Template:
BOCC
Date
6/23/2004
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20040623
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D (sub-attachment) <br />well water or storm water runoff lp' <br />• Limit landscape irrigation and use drought resistant plants <br />3.~ Wastewater Technology <br />• Reduce municipally pro•.ided potable water fur building sewage flow by using gray water or <br />waterless fixtures <br />3.3 Water Use Reduction <br />• Reduce aggregate water use by a minimum of 7.0°.~o than the base, not including irrigation, after <br />meeting EPA l99? fixture performance requirements. Smith Middle and Screegs Elementary would <br />provide baseline use data. <br />Euer;;~' and Atmosphere <br />4,1 Minimum Energy Performance <br />• Design building to meet ASHRAE/TESNA 90..1, state or local energy codes, whichever is more <br />stringent <br />4.2 CFC Reduction <br />• Zero use of CFC-based refrigerants in HVAC systems <br />• Check for other CFC materials, products and systems and make sure that alt are CFC-free <br />4..3 Optimal Energy Efficiency <br />• Increase energy performance by a minimum of 20% in new buildings and 10% in existing <br />structures above those described in 4 1. as demonstrated by simulation using Energy Cost Budget <br />Method described in section 1 I of ASHRAE/IESNA 90.1 <br />4.4 Renersable Energy <br />• During building design, consider the use of high temperature solar or geothermal assisted <br />technologies to provide a portion of the total energy use of the building <br />Material and Resources <br />5.1 Storage and Collection of Recyclables <br />• Provide an easily accessible location that serves the entire building for the collection, separation <br />and storage of recyclables <br />a.:3 Construction Waste IVianagement <br />• During the design process, develop a checklist that focuses on the reduction of construction waste <br />from a design function <br />• Develop a waste management plan that includes a reuse area, recycling azea for separation, and a <br />lunch azea that provides for recycling <br />• Recycle or salvage at least 75%ofgrading and clearing debris by weight <br />_ , , r .. nw-~:__.iT-CnCC/1~V-i-.-.•L.-1D.:~C L...-e-.,4 ~.~U:11 .. 0/t ii'f l1M <br />
The URL can be used to link to this page
Your browser does not support the video tag.