Orange County NC Website
DRAFT <br />constructed, will reduce by as much as $250,000 the offsite road <br />improvement cost to CHCCS in its construction of CHCCS high <br />school #3. <br />B. that additional study and work needs to be done on the <br />following smart growth promoting standards, which, if met, will <br />satisfy $300,000 of the smart growth requirements of paragraph 8 <br />of the INTERLOCAL AGREEMENT and $300,000 of the smart growth <br />requirements of the INTERLOCAL AGREEMENT ADDENDUM "A" for CHCCS <br />high school #3: <br />1. Transportation Standards. The design of CHCCS <br />high school #3 and its facilities shall reduce parking lot size <br />and its associated impervious surfaces by 35% from Orange County <br />School Construction Standards by providing for non-student <br />automobile parking as follows: Phase I and II teacher/staff/ <br />visitor parking, 80 spaces (all to be constructed with Phase I). <br />2. Transportation Enhancement Standards. Reduce <br />dependency on the automobile for school functions and to reduce <br />vehicle miles traveled related to school functions by: <br />a, the purchase of busses or shuttles to be <br />owned by CHCCS or otherwise, in tandem with the development of <br />an enhanced transportation system, for school uses and <br />functions, including student, staff and teacher transportation <br />~~ <br />4 <br />