Browse
Search
2018-680-E Solid Waste - Draper High Rock Convenience Center proposal
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-680-E Solid Waste - Draper High Rock Convenience Center proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2018 9:10:48 AM
Creation date
10/15/2018 8:38:57 AM
Metadata
Fields
Template:
Contract
Date
9/7/2018
Contract Starting Date
2/22/2017
Contract Document Type
Agreement - Consulting
Amount
$100,380.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kevin Lindley, PE <br />September 7, 2018 Page 6 of 8 <br />12.Right-of-way negotiations/acquisition; <br />13.Preparation of easement acquisition maps; <br />14.Off-site roadway work except as outlined above; <br />15.Design of telephone, cable, or gas utilities. DAA can coordinate with these utility companies <br />and provide them copies of plan sheets as necessary, but the individual companies will design <br />their own utilities; <br />16.Design or coordination of water features/ fountains/ pools, exterior signage/graphics or <br />courtyards; <br />17.Changes to the construction plans after construction document approval; <br />18.Construction staking; <br />19.Review agency fees and plat recording or filing fees. If paid directly by DAA, we will invoice <br />for these fees as reimbursable expenses; <br />20.Other CLIENT directed services not specifically included. <br /> <br />COMPENSATION <br />Compensation for engineering services and reimbursable expenses shall be based on the <br />following fees. These fees will be invoiced monthly based on our estimation of the percentage <br />complete on each task or on a time and materials basis depending upon the task. <br /> <br />Fee <br />1 Design Phase Services <br />Preliminary Site & Grading Plan$6,800.00 Fixed Fee <br />Construction Documents$22,400.00 Fixed Fee <br />Project Manual $5,700.00 Fixed Fee <br />Opinion of Probable Construction Cost$7,180.00 Fixed Fee <br />Total Design$42,080.00 Fixed Fee <br />2 Permitting$17,860.00 Fixed Fee <br />3 Bid Phase Services$6,030.00 T&M <br />4 Construction Phase Services$34,410.00 T&M <br />TOTAL PROJECT ESTIMATE$100,380.00 <br />Task <br /> <br /> <br />DocuSign Envelope ID: 5BA5ECE0-B673-42DF-BE20-14267F54B06E
The URL can be used to link to this page
Your browser does not support the video tag.