Orange County NC Website
67 <br />g, -STATE PERMITS REQUIRED <br />1, Does the project involve the mining of earth products? <br />~a <br />_~._--. <br />If so, how many cubic feet of material are expected to be <br />excavatedT <br />Has an application for a Mining Permit been submitted to <br />NCDRCD? <br />Please attach map indicating expected extent of proposed <br />activity. <br />2, Does the project involve genarntion or storage of <br />hazardous or toxic wastes, ns ideatified Sy the <br />Environmental Protection Agancp? (A listing of all <br />hazardous materials Qis available from the Planning <br />Department) <br />Describe the wastes to be generated. <br />How much material is expected to be generated per month? <br />Will any material be treated onsite? <br />Volume? <br />Will any material be stored onsite? <br />Volume? <br />Where will disposal of the material take place? <br />How will materials be transported to the disposal site? <br />What measures .are proposed to protect water quality and <br />air quality in case of spills? <br />