Browse
Search
Item 12-5 - Information Item - Update on the Mebane 2040 Comprehensive Transportation Plan (CTP) (March 2018) and its Relevance for Orange County
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 10-16-2018
>
Item 12-5 - Information Item - Update on the Mebane 2040 Comprehensive Transportation Plan (CTP) (March 2018) and its Relevance for Orange County
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2018 10:52:41 AM
Creation date
10/12/2018 9:58:44 AM
Metadata
Fields
Template:
BOCC
Date
10/16/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
12-5
Document Relationships
Agenda - 10-16-2018 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2018\Agenda - 10-16-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the CTP, as is the Orange County Efland-Buckhorn-Mebane Economic Development <br /> District (E-B-M EDD) and Commercial-Industrial Transition Activity Node (CITAN) area. <br /> Level of Service (LOS) — Level of Service is a term used to represent different driving <br /> conditions, and is a term used as a qualitative measure describing operational <br /> conditions within a traffic stream. LOS varies from Level "A" representing free flow, to <br /> Level "F" where breakdown conditions are evident. <br /> Within the Orange County portion of Mebane's Study Area, 2015 Daily Annual Average <br /> Daily Traffic (AADT) and LOS data by NCDOT has noted congestion on the following <br /> roadways (Attachment 2): <br /> Roadway No. of Lanes AADT LOS <br /> Bowman Road 2 1,100 C <br /> Buckhorn Road 2 9,900 D <br /> north of 1-85/1-40 <br /> Buckhorn Road 2 2,700 C <br /> south of 1-85/1-40 <br /> Lebanon Road 2 3,500 C <br /> Mattress Factory Rd 2 2,500 C <br /> Mill Creek Road 2 1,700 C <br /> Oakwood Street 2 2,600 C <br /> Stagecoach Road 2 4,800 C <br /> Supper Club Road 2 1,600 C <br /> US Hwy 70 2 10,000 D <br /> W. Ten Road 2 1,800 C <br /> Currently Funded STIP Projects — The CTP recognizes projects that are already funded <br /> and planned in the NCDOT 2018-2027 STIP. The STIP is a 10-year State program that <br /> identifies transportation project funding throughout the state. There are currently six (6) <br /> STIP funded projects in the Mebane CTP Study Area, two (2) of which are in Orange <br /> County's jurisdiction (Attachment 3): <br /> • 1-5954 and 1-5958: Interstate maintenance on 1-40/1-85 — The two projects are <br /> pavement rehabilitation beginning east of NC 54 in Graham in Alamance County <br /> to west of Buckhorn Road in Orange County, and extending west of Buckhorn <br /> Road to west of Orange Grove Road. These projects are currently under <br /> construction. <br /> A third project is in Mebane's jurisdiction but will directly benefit the transportation <br /> infrastructure in areas targeted by Orange County for economic development purposes <br /> in and around the E-B-M EDD: <br /> • 1-5711: Interchange improvements at Mebane Oaks Road — Although this project <br /> is in Alamance County it will improve access to Orange County's E-B-M EDD via <br /> Bowman Road and Wilson Road. This project will be under construction in <br /> 2019. <br /> 2040 Protected Daily LOS - A regional planning model, created by Piedmont Authority <br /> for Regional Transportation (PART) was utilized to determine expected 2040 daily traffic <br />
The URL can be used to link to this page
Your browser does not support the video tag.