Browse
Search
2018-673-E Planning - Douglas P. Malinowski Efland Sewer Easement clearing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-673-E Planning - Douglas P. Malinowski Efland Sewer Easement clearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 8:49:09 AM
Creation date
10/10/2018 8:44:01 AM
Metadata
Fields
Template:
Contract
Date
10/5/2018
Contract Starting Date
10/5/2018
Contract Ending Date
11/30/2018
Contract Document Type
Contract
Amount
$3,300.00
Document Relationships
R 2018-673 Planning - Douglas P. Malinowski Efland Sewer Easement clearing
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Project Specifications for Sewer Line Easement Clearing <br />S:\12_Engineering\Efland Sewer\Contracts\Easement Clearing\FY2016-2017\SewerLineEsmtClearingSpecifications_2016.docx <br />Specifications Page 2 of 2 <br />In addition to mowing the ground cover, the Contractor will remove any limbs or <br />other vegetative growth that projects into the easement area, up to a height of 10 feet. <br />There may also be trees or limbs that have fallen across the easement. These will <br />need to be cut to the limits described and either hauled away or chipped in the <br />field as described above. <br />There are some manholes that are enclosed within fenced-in yards or may <br />otherwise be inaccessible, due to structures built by property owners around the <br />easements. To the greatest extent possible, the Orange County Engineering staff <br />will advise the Contractor of any known structures that might impede clearing before <br />work begins. However, if the Contractor comes across an area that would require <br />destruction of such fences or other structures in order to clear the easement, the <br />Contractor should contact Orange County Engineering Staff for guidance, prior to <br />taking any further action. <br />Exclusions <br />1.The grounds within the fence lines of the Richmond Hills Pump Station and the <br />Brookhollow Pump Station. <br />Schedule <br />Once notified to begin work, please note that time is of the essence. Work on <br />this project should commence as soon as possible and continue without interruption <br />until the project is completed. Should there be delays, for whatever reason, the work <br />shall be completed no later than the termination date of contract. <br />The grounds within the SURSHUWLHVRZQHGE\0U0LFKDHO(IODQGLGHQWLILHGDV <br />3,1VDQGGLVSOD\HGLQ([KLELW% <br />0U(IODQGKDVQRWLILHG2UDQJH&RXQW\WKDWKHZLOODVVXPHPRZLQJFOHDULQJ <br />UHVSRQVLELWOLWLHVIRUWKHVHZHUHDVHPHQWVWUDYHUVLQJKLVSURSHUWLHV <br />. <br />DocuSign Envelope ID: 0367C8AB-A6A6-4692-81B5-A3CECE426B4E
The URL can be used to link to this page
Your browser does not support the video tag.