Orange County NC Website
<br />Attaclunent A <br />Recreation and Parks -Parks Operations Base <br />Projected Timetable for Design/Build Option <br /> <br />Board Authorizes Project June-04 <br />Staff Conducts Site Analysis _ July-04 <br />Board Approves Site Selection and <br />__ <br />Authorizes Design Consultant Contract <br />August-04 <br />Design Prepared September-04 <br />Board Approves Design October-04 <br />Construction Drawings and Specifications <br />Prepared, project bid out December-04 <br />Board Authorized Development Contract Januazy-OS <br />Construction Begins February-OS <br />Construction Finished July-OS <br /> <br /> <br />