Browse
Search
2017-717-E EMS - Excellance ambulance mounting agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-717-E EMS - Excellance ambulance mounting agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 1:51:49 PM
Creation date
10/2/2018 4:44:09 PM
Metadata
Fields
Template:
Contract
Date
12/1/2017
Contract Starting Date
12/1/2017
Contract Document Type
Agreement - Services
Amount
$109,289.31
Document Relationships
R 2017-717-E EMS - Excellance ambulance mounting agreement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:FF75FEC8-F41A-4602-AD91-CF4E1D20Fll7 <br /> REMOUNT PRICING <br /> Version 15.1 <br /> 95 <br /> 96 WHEELBASE MEASUREMENT: TBD <br /> 97 <br /> 98 CURRENT CHASSIS ODOMETER READING(Required if Excellance takes ownership of the take-off chassis): Over 200,000 <br /> 99 <br /> 100 DESCRIPTION OF ANY CHASSIS DAMAGE(Required if Excellance takes ownership of the take-off chassis): TBD <br /> 101 <br /> 102 <br /> 103 <br /> Excellance to take ownership of Take-Off Chassis-Enter as a negative number the amount for the chassis <br /> 104 ( 1 )credit here: -3,500.00 -3,500.00 <br /> 105 <br /> 106 MAKE THE CHASSIS ROADWORTHY <br /> 107 ( 1 )THERE WILL BE NO ADDED WORK PERFORMED TO THE TAKE-OFF CHASSIS. 0.00 0.00 <br /> 120 CHASSIS <br /> 121 ( 1 )Dealer or Customer supplied chassis 400.80 400.80 <br /> THE FOLLOWING FIELDS DESCRIBING THE NEW CHASSIS MUST BE FILLED OUT REGARDLESS OF WHO IS <br /> 125 SUPPLYING IT. <br /> 129 ENTER MODELYEAR FOR NEW CHASSIS: 2018 <br /> 130 ENTER MODEL OF NEW CHASSIS: F550 4x4 <br /> 131 ENTER MAKE OF NEW CHASSIS: Ford <br /> 132 ENTER CAB TO AXLE MEASUREMENT OF NEW CHASSIS: 1081, <br /> 133 ENTER WHEELBASE MEASUREMENT OF NEW CHASSIS: 1891, <br /> 134 <br /> 135 <br /> 136 THE REMOUNT WILL HAVE THE FOLLOWING WORK INCLUDED IN THE STANDARD BASE CONVERSION: <br /> 137 CHASSIS INSPECTION <br /> 138 Inspected for damage and defects upon delivery <br /> 139 Test Drive <br /> The chassis shall be inspected against(A)Excellance's Chassis order,and(B)the specifications supplied by <br /> 140 the customer/dealer. <br /> 141 All loose equipment received with the chassis shall be inventoried and stored. <br /> All chassis functions shall be tested for proper operation(accelerator,brakes,headlights,wipers,horn,radio, <br /> 142 air conditioner,gauges,dome lights,turn signals,parking lights,etc.). <br /> 143 <br /> 144 CHASSIS WORK TO BE PERFORMED <br /> 145 Heat Shields shall be installed above the exhaust system. <br /> 146 Chassis shall have undercoating applied. <br /> 147 Exhaust modifications shall be performed as necessary. <br /> 148 Air valve extensions shall be installed on the rear inner tires. <br /> 149 New mounting hardware shall be installed including:Grade 8 bolts,washers,nylon lock-nuts,spacers,outriggers(Type I units only) <br /> 150 New mounting bracket for the rear bumper shall be installed to the chassis frame. <br /> 151 Chassis high idle system shall be connected and operational. <br /> 152 Chassis electrical charging/battery system shall be connected to the module electrical system. <br /> 153 New Chassis emergency light wiring shall be installed(Grille,Intersection lights,etc.) <br /> Rev:082013 3 of 14 11/30/2017 9:44 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.