Browse
Search
2017-715-E AMS - Brown Bros jail drain repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-715-E AMS - Brown Bros jail drain repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 1:47:52 PM
Creation date
10/2/2018 4:43:42 PM
Metadata
Fields
Template:
Contract
Date
12/7/2017
Contract Starting Date
10/11/2017
Contract Ending Date
12/30/2017
Contract Document Type
Agreement - Services
Amount
$8,493.00
Document Relationships
R 2017-715-E AMS - Brown Bros jail drain repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> DocuSign Envelope ID: 1A2F6F38-EEE5-4E08-B32B-FD2AF5679B8C i{ <br /> 1 <br /> 1 <br /> ti R .. <br /> SINCE <br /> 1933 <br /> PLUMBING & HEATING COMPANY, INC. <br /> E%X QUOTE FROK: <br /> BROWN BROTEERS PIXIMING & HEATING. CO. INC. <br /> PH.#919-220-2554. . N.C. LIC. #292. . FAX #919-220-2531 <br /> DATE: October 19, 2017 <br /> ----------------------------------------------------------- <br /> JOB tow: Orange County Ja11 <br /> Attn: Jeff Tho=sson <br /> .Email: jethomPson@co,Orange.no.us f <br /> Phone: (919) 245-2655 <br /> Location: Hillsborough J <br /> Ref; Shower Drain Replacement <br /> Scope of Work: <br /> Provide ma.terxal and labor to replace drainage for one shower adjacent <br /> to pipe chase 17. <br /> y Uption One: <br /> Remove concrete floor slab in pipe chase and excavate from that point <br /> to the shower pare outlet and conaect_ Not piping and fittings sh—.11 be <br /> cast. iron. Patch floor scut with concrete of matching thickness as <br /> existing. <br /> FOR THE PRICE OF: $8,493.00 <br /> Option two: (In addition to option one) <br /> Pamove and replace stainless shower base to allow access to and <br /> replacement of piping. <br /> FOR THE ADDITIONAL PRICE OF: $4,31111.00 <br /> Labor rates are based on working hours of 7.30 am to A:3D pm weekdays. <br /> EXCLUSIONS: Bond <br /> Proposal may be withdrawn thdrawn if not accepted within 30 days, <br /> PAYNIENTS TO BE MWE AS 3I?01WWS: Monthly <br /> r ` <br /> AUTHORIZED SIB..,. A <br /> sae -- Project Manager <br /> PO Box 15668-2820 Noah Roxboro Road-Durham,NC 27704-0668 Telephone(919)220-2554 Fax(919) 220-2531 <br />
The URL can be used to link to this page
Your browser does not support the video tag.