Browse
Search
2017-699-E AMS - Harris Bros Whitted ATS panel
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-699-E AMS - Harris Bros Whitted ATS panel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2018 1:47:13 PM
Creation date
10/2/2018 4:40:40 PM
Metadata
Fields
Template:
Contract
Date
10/31/2017
Contract Starting Date
10/27/2017
Contract Ending Date
11/27/2017
Contract Document Type
Contract
Amount
$2,467.00
Document Relationships
R 2017-699-E AMS - Harris Bros Whitted ATS panel
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 150FAC57-4891-47F3-9504-4284DB66973C <br /> Harris Bros. Electric & Controls, Inc. <br /> 2712 Hillsborough Road <br /> Durham, NC 27705 <br /> Phone: (919) 220-8500 ** Fax: 1919) 220-7009 <br /> BID PROPOSAL <br /> Date: October 12, 2017 <br /> To: Allen Dorman <br /> Company: Orange County <br /> Phone: 919-619-8859 <br /> E-mail: <t3cyi: t�rr_c�rrari �a ��EZt �zc. Pro <br /> From: Calvin Harris <br /> Company: Harris Bros. Electric_ $r Controls, Inc, <br /> Telephone: (919) 220-8500 <br /> Fax: (919) 220-7069 <br /> Email: calvinrharrip msn.com <br /> Project: Whitted Building ATS to Panel LPD2 <br /> Scope of Work: <br /> • Intercept the feeder feeding panel LPD2 and connect it to the existing ATS.The ATS is <br /> protected by a 225A breaker and the panel LPD2 is protected by a 250A breaker. <br /> • The ampacity protecting panel LPD2 will be lowered to 225A because that is what the <br /> existing ATS is protected by, <br /> • We do not know the existing load of panel LPD2 so we are not responsible for the <br /> feeder over current device tripping,. <br /> • Electrical permit included <br /> • After hours pay included. <br /> Total Base Bid:. $2,467.00(Two Thousand Four Hundred Sixty-Seven Dollars) <br /> Alt#1: Add if this needed to be done after hours. Add to Base Bid: $350.00 <br /> Notes: <br /> i <br /> I <br /> • Work to be done during normal business hours. i <br /> • Bid good for 30 days. <br /> f <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.