Browse
Search
2018-625-E Solid Waste - Draper Aden retaining wall
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-625-E Solid Waste - Draper Aden retaining wall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 3:04:47 PM
Creation date
9/27/2018 2:24:03 PM
Metadata
Fields
Template:
Contract
Date
1/22/2018
Contract Starting Date
3/1/2017
Contract Document Type
Agreement
Amount
$5,000.00
Document Relationships
R 2018-625 Solid Waste - Draper Aden retaining wall
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2C98A942-6292-49C3-81F6-C8CD7BC59159 <br /> R. Kevin Lindley, PE <br /> November 29, 2017 <br /> Page 2 of 3 <br /> III. FEES <br /> A. Basic Services for repair design of the retaining walls........................ $3,400 <br /> SUBTOTAL, DESIGN: ............................. $3,400 <br /> B. Review of Shop drawings and submittals ................................................... $400 <br /> C. Construction Administration (RFI's, Field Questions) ............................... $400 <br /> D. Client Meeting........................................................................................................ $200 <br /> E. Site visits with written reports.................................................................. ... $600 <br /> SUBTOTAL, CONSTRUCTION PHASE: ............................... $1,600 <br /> TOTAL ...............................................................................•.......... 5 000 <br /> (Note: allowances for reimbursable costs (mileage, printing) are included) <br /> IV. DELIVERABLES <br /> Our deliverable documents to you will be in the form of electronic or plotted versions of AUTOCAD <br /> drawings and specifications in Word format. We assume that we will provide one such set of documents <br /> per design team review or submittal to owner, and one final such set of documents for use as project <br /> construction documents. <br /> V. ASSUMPTIONS <br /> ❖ Our service includes reasonable and appropriate response to review comments made by <br /> building officials or the Owner. <br /> ❖ Cost estimating and special inspections are excluded from this proposal. <br /> If this proposal is acceptable, please let us know by signing where indicated below and returning a <br /> copy to us. Please let us know if our scope and fee statements do not align with your expectations or <br /> project budget. We look forward to working with you again. If you have any questions, please feel free to <br /> call myself or Chris Herndon, PE at 919-827-0864. <br /> Sincerely, <br /> DRAPER ADEN ASSOCff�T <br /> u` <br /> C. Tyrus Clayton, Jr., P.E. <br /> Senior Project Manager/Associate <br />
The URL can be used to link to this page
Your browser does not support the video tag.