Browse
Search
2018-624-E Solid Waste - Draper Aden amendment 2
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-624-E Solid Waste - Draper Aden amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 4:07:44 PM
Creation date
9/27/2018 2:23:22 PM
Metadata
Fields
Template:
Contract
Date
5/18/2018
Contract Starting Date
3/1/2017
Contract Document Type
Contract Amendment
Amount
$5,470.00
Document Relationships
2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-802-E Solid Waste - Scope of Work Draper Environmental Monitoring contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-624 Solid Waste - Draper Aden amendment 2
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering Surveying Environmental Services <br />Draper Aden Associates <br />Section Two <br />Experience <br />7 <br />and construction management of a solid waste baling and materials processing (recycling) facility, for Watauga <br />County, the Cities of Boone and Blowing Rock, and Appalachian State University. The facility manages 200 tons <br />per day of refuse, as well as all recyclables collected by the region’s recycling program. Facility size is 22,000 <br />square feet, including tipping floor, baling floor, recycling processing area and loading dock. When landfill <br />expansion plans were terminated, we designed the conversion of the facility to a recycling center and solid <br />waste transfer station. The conversion made use of an innovative means to implement grade separation at the <br />formerly single grade building. <br />Assessment Plan <br />During expansion planning for the County’s landfill/balefill facility, groundwater testing indicated organic <br />impact to groundwater. Negotiations with the NCDEQ resulted in a phased plan for groundwater impact <br />analysis and corrective action. Monitored Natural Attenuation (MNA) was ultimately chosen as the corrective <br />action program, following an Assessment of Corrective Measures (ACM). <br />Landfill Closure CQA <br />Final closure of the 20-acre facility was completed with Draper Aden Associates providing full-scale construction <br />management and inspection services. A gas management system was designed into the project. <br />Groundwater and Gas Management <br />Draper Aden Associates was tasked with determining the rate, character, and extent of groundwater <br />contamination and gas migration off-site and into surrounding residential and commercial areas. Migration <br />of gas has extended into fractured bedrock beneath the facility. Draper Aden Associates is continuing in the <br />assessment effort, working closely with the state to develop a cost-effective program to alleviate the issue. <br />Solid Waste Management Program <br />Springfield Road Landfill <br />Henrico County, Virginia <br />Draper Aden Associates has worked with Henrico County on <br />key components of the Springfield Road Landfill (SRLF) facility <br />for a total of 18 years, including the past six years. Draper Aden <br />Associates has successfully completed the following projects for <br />the County: <br />Engineering and Consulting <br />• Design, permitting and implementation of an expansion to the Eastern Fill area <br />• Design and implementation of scale facilities and convenience center <br />DocuSign Envelope ID: 09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339DocuSign Envelope ID: 41BC5C93-0D4F-4535-B939-248B032E3585
The URL can be used to link to this page
Your browser does not support the video tag.