Browse
Search
2018-624-E Solid Waste - Draper Aden amendment 2
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-624-E Solid Waste - Draper Aden amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 4:07:44 PM
Creation date
9/27/2018 2:23:22 PM
Metadata
Fields
Template:
Contract
Date
5/18/2018
Contract Starting Date
3/1/2017
Contract Document Type
Contract Amendment
Amount
$5,470.00
Document Relationships
2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-802-E Solid Waste - Scope of Work Draper Environmental Monitoring contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-624 Solid Waste - Draper Aden amendment 2
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering Surveying Environmental Services <br />Draper Aden Associates <br />Section Two <br />Experience <br />6 <br />• Leachate Monitoring Program <br />• Voluntary Residential Monitoring Program <br />Orange County Regional Landfill: Active C&D Facility <br />• Semiannual Groundwater Monitoring Program <br />Convenience Center Design <br />After a previous design of the Eubanks Road Waste and Recycling Center was found to meet the project budget <br />requirements, Draper Aden Associates was contracted to redesign the project to lower the overall construction <br />costs. Draper Aden Associates completed the design and permitting of the full service waste and recycling <br />center that could see up to 800+ customers in a single day. The facility design included relocation of the current <br />landfill scales and scale operator building, full recycling services, household hazardous waste, swap shop, and <br />disposal for all types of customer waste. Project was bid in October 2016 and is slated for construction in early <br />2017. DAA will administer the contract and be responsible for construction management and inspections. <br />Storage and Support Facilities <br />Draper Aden Associates provided design, permitting, and <br />construction management for the new Recycling Bin Storage <br />and Assembly building at the Solid Waste Department office <br />complex on Eubanks Road. This building was constructed to <br />allow staff a place to receive, assemble and store residential <br />recycling bins until they could be dispersed to a customer. <br />Project was completed in early 2016. <br />Our project approach and understanding regarding each of <br />these programs is provided at the end of this proposal. <br />Watauga County Landfill <br />Watauga County, North Carolina <br />Master Planning <br />Master planning for the existing County landfill, as well as <br />permit design for its expansion was performed. A leachate <br />management system was evaluated, with pump and haul, on <br />site treatment and pretreatment evaluated. <br />Recycling / Baling Facility and Transfer Station <br />Draper Aden Associates completed the design, permitting <br />DocuSign Envelope ID: 09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339DocuSign Envelope ID: 41BC5C93-0D4F-4535-B939-248B032E3585
The URL can be used to link to this page
Your browser does not support the video tag.