Orange County NC Website
3 <br />Experience and/or capability may be required in any of the following subjects: <br /> <br />x Landfill Gas Management and Recovery <br />x Composting & Organics Management <br />x Groundwater Management <br />x Landfill Redevelopment <br />x Master Planning and Permitting <br />x Geotechnical Engineering <br />x Facilities Planning and Design <br />x Gas and Groundwater Remediation <br />x Quality Assurance/Quality Control <br />x Materials Handling and Recovery <br />x Regulatory Compliance <br />x Site Assessment <br />x Transfer Station Design and Construction <br />x Waste Stream Analysis and Minimization <br />x Rate Studies <br />x Risk Assessment <br />x Cost Estimating <br />x Laboratory Analysis <br />x Alternative/Emerging Technologies Assessment <br />x Solid Waste Strategic Planning <br />x Construction and Demolition debris recycling <br />x Waste and Recyclables Collection <br /> <br />Note: It is not required that a firm be experienced/capable in all of the above areas of expertise, however, <br />the successful firm may need access to this expertise through sub-contracting or other arrangements <br />as approved by County. <br /> <br /> <br />SUBMISSION REQUIREMENTS <br />PROPOSAL FORMAT <br />Orange County has achieved one of the highest verifiable waste reduction rates in the State of North <br />Carolina as calculated by the NC Waste Management Division. The 2014-2015 reduction rate exceeds the <br />County’s 61% reduction goal by 4%. In keeping with our efforts to reduce waste at its source, we are <br />asking that respondents provide double-sided submission copies on recycled content paper, to the extent <br />practicable. <br /> <br />Each respondent is requested to submit two hard copies of your proposal and three (3) copies on CD’s <br />containing the complete RFP in Adobe Acrobat format by the submittal deadline at 4:00 pm (EST), <br />Wednesday, December 7, 2016. Most of the selection team members will conduct their individual reviews <br />from the material provided on the CD, so please ensure that they are readable before they are sent and that <br />your firm’s name appears on the face of the CD. <br /> <br />Engineers should submit qualifications that include the following: <br /> <br />x General information of the firm, available resources, subcontractors and range of services. <br />x Experience of the firm with similar “as needed” engineering contracts. Include references. <br />x Qualifications of the proposed Project Manager(s) and other key personnel that would most likely be <br />assigned. <br />x Geographic location of the firm (or office carrying out the work) relative to Orange County <br />x Copy of current rate sheet <br />DocuSign Envelope ID: 09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339DocuSign Envelope ID: 41BC5C93-0D4F-4535-B939-248B032E3585