Browse
Search
2018-623-E Solid Waste - Draper Aden CD landfill aerial survey 0218
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-623-E Solid Waste - Draper Aden CD landfill aerial survey 0218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2018 10:21:56 AM
Creation date
9/27/2018 2:22:37 PM
Metadata
Fields
Template:
Contract
Date
2/9/2018
Contract Starting Date
2/9/2018
Contract Document Type
Agreement
Amount
$7,400.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:730BOEA2-D934-4504-B42A-928DAE22F3FB <br /> Section Four 23 <br /> Qualifications of Key Personnel <br /> Donald M. Marickovich, PE <br /> Project Engineer <br /> Mr.Marickovich is responsible for developing and implementing strategies for <br /> monitoring and controlling methane gas at solid waste facilities. Tasks include <br /> development of gas management programs,design,bidding,and installation of active <br /> gas collection systems,evaluation of monitoring results,interfacing with regulatory <br /> agencies,and the development and implementation of remediation plans to prevent <br /> the migration of methane gas off-site. <br /> li <br /> Bedford County Landfill No. 1,Bedford County,VA: Design, bidding, installation <br /> Senior Project Engineer and operation of an active gas collection system successful in preventing gas <br /> 24 years with the firm migration. System consists of 41 collection wells,approximately 5,825 LF of HDPE <br /> 36 years of experience piping, and a 70 to 700 SCFM blower/flare station. <br /> Education Henrico County,Richmond,Virginia: Expansion of landfill gas recovery and <br /> • M.S./1990/ collections system,operations and optimization of system. <br /> Environmental <br /> Engineering/Virginia Smyth County Landfill,Smyth County,VA: Development and implementation of <br /> Tech a gas remediation plan. Design, procurement and installation of a 30 to 250 scfm <br /> • B.S./1976/Physics/ blower flare station. Operating, monitoring and adjusting the active gas extraction <br /> Drexel University system. <br /> Professional Washington County Landfill,Washington County,VA: Implementation and <br /> Registration coordination of a gas remediation plan involving the relocation of gas probes and <br /> • Professional design, installation and operation of an active gas collection system for migration <br /> Engineer/1999NA control. System consists of nine active wells including one pulling from bedrock <br /> voids,about 2,025 LF of HDPE and PVC piping,and two separate blowers. <br /> Areas of Expertise <br /> • Landfill gas modeling Harrisonburg Landfill,City of Harrisonburg,VA: Developed, procured and <br /> and system design started up a portable gas extraction testing system used to evaluate the <br /> • Design, bidding, effectiveness of active gas collection at the landfill.Assisted in the design, start- <br /> installation and up and balancing of permnent active gas collection system that is successful in <br /> operation of active gas preventing gas migration. <br /> collection systems <br /> • Development and Augusta Regional Landfill,Augusta County,VA:New Source Review Air Permit <br /> implementation Application for expansion of the landfill. Landfill Title V Air Permit Application <br /> of landfill gas and submittal. Tier 2 testing and reporting. Dust Control Plan development and <br /> remediation plans for submittal. Air emissions estimating and reporting. <br /> gas migration issues <br /> irk, i <br />
The URL can be used to link to this page
Your browser does not support the video tag.