Browse
Search
2018-623-E Solid Waste - Draper Aden CD landfill aerial survey 0218
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-623-E Solid Waste - Draper Aden CD landfill aerial survey 0218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2018 10:21:56 AM
Creation date
9/27/2018 2:22:37 PM
Metadata
Fields
Template:
Contract
Date
2/9/2018
Contract Starting Date
2/9/2018
Contract Document Type
Agreement
Amount
$7,400.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:730BOEA2-D934-4504-B42A-928DAE22F3FB <br /> Section • <br /> Qualifications of • <br /> 4. <br /> Organizational Chart <br /> k ; <br /> Mike Lawless, PG, CPG <br /> Managing Principal <br /> C.Tyrus Clayton, Jr., PE <br /> Client Manager <br /> Environmental Engineering/Consulting Construction Services <br /> Tom Laughlin, MS,CES,CHMM Bill Hase, PE Lindsay Weiford <br /> Environmental Scientist Project Manager CQA Program Manager <br /> Leonard"Rip"Ford, PhD, PG Andrew Mericle, PE Jessie Ewald, PE, LEED°AP <br /> Hydrogeologist Project Engineer Geotechnical Team Leader <br /> Ryan Sadler/Jack Sherrill Donald M.Marickovich, PE <br /> Field Services Project Engineer <br /> Support Services Subconsultants <br /> SOLI I) WASTE COKER <br /> MANAGEMENT COMPOSTING Site Development and Infrastructure <br /> Surveying <br /> Structural Engineering <br /> D CONSULTING <br /> CONSULTANTS <br /> Subsurface Utility <br /> Engineering <br /> �' Draper Aden Associates <br /> Engineering • Surveying • Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.