Browse
Search
2018-623-E Solid Waste - Draper Aden CD landfill aerial survey 0218
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-623-E Solid Waste - Draper Aden CD landfill aerial survey 0218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2018 10:21:56 AM
Creation date
9/27/2018 2:22:37 PM
Metadata
Fields
Template:
Contract
Date
2/9/2018
Contract Starting Date
2/9/2018
Contract Document Type
Agreement
Amount
$7,400.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:730BOEA2-D934-4504-B42A-928DAE22F3FB <br /> Section Two 6 <br /> Experience <br /> • Leachate Monitoring Program <br /> • Voluntary Residential Monitoring Program <br /> Orange County Regional Landfill: Active C&D Facility <br /> • Semiannual Groundwater Monitoring Program <br /> Convenience Center Design <br /> After a previous design of the Eubanks Road Waste and Recycling Center was found to meet the project budget <br /> requirements, Draper Aden Associates was contracted to redesign the project to lower the overall construction <br /> costs. Draper Aden Associates completed the design and permitting of the full service waste and recycling <br /> center that could see up to 800+ customers in a single day. The facility design included relocation of the current <br /> landfill scales and scale operator building,full recycling services, household hazardous waste, swap shop,and <br /> disposal for all types of customer waste. Project was bid in October 2016 and is slated for construction in early <br /> 2017. DAA will administer the contract and be responsible for construction management and inspections. <br /> Storage and Support Facilities <br /> Draper Aden Associates provided design, permitting,and <br /> construction management for the new Recycling Bin Storage <br /> and Assembly building at the Solid Waste Department office 4 <br /> complex on Eubanks Road. This building was constructed to <br /> allow staff a place to receive,assemble and store residential �� <br /> recycling bins until they could be dispersed to a customer. <br /> Project was completed in early 2016. <br /> Our project approach and understanding regarding each of <br /> these programs is provided at the end of this proposal. <br /> Watauga County Landfill <br /> Watauga County, North Carolina <br /> Master Planning I, <br /> Master planning for the existing County landfill,as well as <br /> permit design for its expansion was performed. A leachate <br /> i, <br /> management system was evaluated,with pump and haul, on <br /> site treatment and pretreatment evaluated. <br /> Recycling /Baling Facility and Transfer Station <br /> Draper Aden Associates completed the design, permitting <br /> Irki <br />
The URL can be used to link to this page
Your browser does not support the video tag.