Browse
Search
Agenda - 05-03-2005-9f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 05-03-2005
>
Agenda - 05-03-2005-9f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:43:55 PM
Creation date
8/29/2008 10:20:11 AM
Metadata
Fields
Template:
BOCC
Date
5/3/2005
Document Type
Agenda
Agenda Item
9f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br />Table 2: Orange County <br />ID <br />Location & Description <br />Summary of Changes <br />I -0305 <br />T-85 — <br />m Construction initiation slips from FYI to <br />I-40 at Hillsborough to <br />FY 12 <br />Durham County line; widen <br />. Completion of right -of -way purchasing slips <br />to six lanes and reconstruct <br />from FY08 to FYI <br />interchanges <br />a Cost increase from $43.5 million to $52 <br />million <br />U -2803 <br />Smith Level Road — <br />• Construction completion slips from FY05 to <br />Rock Haven Rd. to bridge no. <br />FY 10 <br />88; widen to multilanes <br />. Cost increases from $3.5 million to $5.2 <br />million <br />U -3100 <br />Hillsborough Rd — <br />. Right -of -way purchasing slips from FY10 to <br />Lorraine St. to Old <br />FY12 <br />Fayetteville Rd,; widen to 36- <br />. Construction continues to be Postyear <br />foot curb- and - gutter <br />. Cost increase from $5.5 million to $7,2 <br />million <br />U -0624 <br />South Columbia Street— <br />• Construction completion slips from FY07 to <br />Purefoy Rd. to Manning Dr.; <br />FY09 <br />include bicycle lanes <br />. Cost increases from $3.1 million to $4.4 <br />million <br />• Cost increase from $3.1 million to $4.4 <br />million <br />• Project is categorized as Regionally <br />Significant, thus must be operational by 2010 <br />to avoid Air Quality analysis requirement <br />U -3306 <br />Weaver Dairy Road — <br />* Construction completion slips from FY07 to <br />NC 86 to Erwin Rd.; corridor <br />FY09 <br />upgrade, part on new location <br />. Cost increases from $113 million to $13.8 <br />million <br />U -4008 <br />US 15 -501 /Erwin Road — <br />• Construction completion slips from FY04 to <br />Intersection Improvement <br />FY05 <br />• Cost increases from $3.2 million to $43 <br />million <br />U -3808 <br />Elizabeth Brady Road <br />• Construction initiation slips from FY09 to <br />Extension — <br />FYI I <br />South of US 70 Business to <br />a Cost increases from $12 million to $16.9 <br />north of US 70 bypass; <br />million <br />multilanes with new crossing <br />of Eno River <br />
The URL can be used to link to this page
Your browser does not support the video tag.