Browse
Search
Agenda - 05-03-2005-9f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 05-03-2005
>
Agenda - 05-03-2005-9f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:43:55 PM
Creation date
8/29/2008 10:20:11 AM
Metadata
Fields
Template:
BOCC
Date
5/3/2005
Document Type
Agenda
Agenda Item
9f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ice <br />Comparison of TIP Projects in FY2004 -2010 & FY 2006 -2012 TIPS <br />The following two tables summarize the project funding, cost and schedule changes that <br />have occurred going from the FY2004 -2010 TIP to the draft FY2006 -2012 TIP. For the <br />most part, project changes occur when the initiation and completion of the construction <br />funding slips one to two years, and when project costs increase. It is assumed that the <br />overall project completion delay will be similar in length to the delay in project <br />construction funding. The most significant impacts include: 1) the demotion of the East <br />End Connector — project construction funding slips from Fiscal Year 2010 to "Postyear" <br />(or, indefinitely); and, 2) no new, major roadway projects have been funded in the draft <br />FY2006 -2012 TIP. <br />Table 1: Durham County <br />ID <br />Location ,& Description <br />Summary of Changes <br />LJ -0071 <br />East End Connector — <br />• Construction initiation slips from FYI to <br />NC 147 to NC98; multilane <br />Postyear (indefinite) <br />divided; part on new location <br />- Completion of right -of -way purchasing slips <br />from FY09 to FY12 <br />• Funding source changed from Surface <br />Transportation Program (STP) to State <br />Highway Trust Fund <br />R -2906 <br />NC 55 — <br />. Construction completion slips from FY05 to <br />US 64 in Wake County to <br />FY07 <br />Cornwallis Rd. in Durham <br />. Cost increases from $46.7 million to $63.4 <br />County; widen to multilanes <br />million <br />U -3308 <br />NC 55 (Alston Ave.) — <br />• Construction completion slips from F,Y09 to <br />NC 147 to Holloway St.; <br />FY12 <br />widen to four lane divided <br />. Cost increases from $16 million to $19.9 <br />million <br />U -3309 <br />T.W. Alexander Drive — <br />a Construction completion slips from FY08 to <br />Cornwallis Rd. to Miami <br />FY10 <br />Blvd.; widen to four -lane <br />. Cost increases from $7 million to $13.1 <br />divided <br />million <br />U -4009 <br />US 15 -501 Service Rd. — <br />. Construction completion slips from FY04 to <br />Relocate existing service road <br />FY06 <br />• Cost increases from $2.9 million to $4 million <br />U -4010 <br />NC 98: Holloway St. to <br />• Construction completion slips from FY04 to <br />Junction Rd. <br />FY06 <br />• Cost increases from $2.0 million to $3.0 <br />million <br />U -4012 <br />US 15 -501 — <br />• Construction completion slips from FY05 to <br />Mt. Moriah to Garrett Rd.; <br />FY06 <br />add additional lanes and turn <br />. Cost increases from $8.4 million to $10.8 <br />lane <br />I million <br />
The URL can be used to link to this page
Your browser does not support the video tag.