Browse
Search
Agenda - 05-03-2005-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 05-03-2005
>
Agenda - 05-03-2005-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:01:04 AM
Creation date
8/29/2008 10:20:02 AM
Metadata
Fields
Template:
BOCC
Date
5/3/2005
Document Type
Agenda
Agenda Item
9e
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPDATED 04/29/05 <br />QUESTIONS/OBSERVATIONS C~ <br />CHCCS HIGH SCHOOL #3 BUDGET SHORTFALL <br />September 2004 documents produced by the architects anticipated a budget shortFall of <br />approximately $4.5 million, When did the architects last provide a formal update to CHCCS <br />on likely bids, and what financial impacts did that update anticipate? <br />• What is the explanation offered by the architects far why the bid results were so far off from <br />their September estimation of likely project costs ($39.2 million now vs. $35..4 million then)? <br />In light of the tight construction market and anticipated project budget overruns, did the <br />architects and CHCCS consider and bid alternates? If so, what were they? If not, why <br />not? Would the addition of a value engineering component be helpful? <br />Will CHCCS consider revising the design of the project, or rebidding the project within a <br />time frame that might still allow an August 2007 opening? <br />Will CHCCS consider delaying the opening until August 2008 (or later) and rebid the <br />current (ar revised) design in 6-9 months (or some other appropriate timeframe)? <br />• What is the likely timeline for Carrboro development review process decisions, and how are <br />those likely to impact the current planned opening of August 2007? <br />Does the BOCC want to consider as a starting point the Manager's recommendation of <br />several weeks ago that $3.8 million of the $12.8 million in alternative financing currently <br />programmed for CHCCS Elementary #10 be reallocated to High School #3? <br />What changes (if any) would be needed to the interlocal agreement if the BOCC decides to <br />provide some level of additional funding for this project? <br />If opening High School #3 in August 2007 is a priority, will CHCCS redirect some portion of <br />expected pay-as-you-go revenue over the next several years to help offset the additional <br />project cost? <br />• Will CHCCS be considering temporary ways of addressing CHCCS high school <br />overcrowding, such as additional mobile units, rental of temporary space, or other <br />measures? <br />CHCCS expended accumulated impact fees (with plans to "reimburse" the project budget <br />later through designation of a portion of CHCCS's future pay-as-you-go funds) to provide <br />cash for the additional $1,142 million cost of the Glover property, This approach adhered <br />to the provision of the interlocal agreement that precludes Orange County from incurring <br />additional debt if the project budget increases. That seems to be a different set of <br />circumstances than reallocating a portion of the $12.8 million far Elementary #10, which <br />DOES involve incurring more debt for THIS project (although not more debt than Orange <br />County was already planning to issue in the near term). <br />What are the likely impacts of ongoing discussion between Town of Carrboro and DOT <br />regarding Smith Level Road improvements on the HS#3 project budget and timeline? <br />
The URL can be used to link to this page
Your browser does not support the video tag.