Orange County NC Website
DRAFT <br />A. that the following smart growth promoting standards, <br />if met in the design and plans for Phase I of CHCCS high school <br />#3, will satisfy $1,900,000 of the smart growth requirements of <br />paragraph 8 of the INTERLOCAL AGREEMENT and $1,900,000 of the <br />smart growth requirements of the INTERLOCAL AGREEMENT ADDENDUM <br />"A" for CHCCS high school #3: <br />1. Transportation Standards. The building shall be <br />located within 34 mile of an existing or planned trail, greenway, <br />a~ <br />bikeway or bus line. The design of CHCCS high school #3 and its <br />facilities shall provide bike racks and storage for 10% of the <br />building occupants, provide preferred parking for carpools and <br />alternative vehicles and reduce parking lot size and its <br />associated impervious surfaces by at least 35% from Orange <br />County School Construction Standards by providing no more than <br />420 spaces for Phase I and Phase II student/teacher/staff/ <br />visitor motor vehicle parking, all to be constructed with Phase <br />I. <br />2. Site Standards. The design of CHCCS high school <br />#3 and its facilities shall (1) preserve a minimum of 30% of the <br />site in undeveloped space; and (2) provide shade on at least 300 <br />of non-roof impervious surface on the site within 5 years or use <br />an open grid pavement system, with less than 50% impervious <br />surface, for SOo of the parking area. The site shall comply <br />2 <br />