Orange County NC Website
<br />_3_ <br />TWC's proposed Maximum permitted rate for the Basic Service Tier (BST) for NC-0276b in <br />2005 is $1:3.61, Customers pay the BST plus the "Add-on" Cost of Service Network Upgrade <br />Chazge of $2,11, TWC's proposed monthly combined rate is $15.72 (see Table 4), The <br />"selected"combined rate is $14.95; that is $0.77 less than the maximum permitted rate. <br />The next table chronicles changes in the regulated Basic Service Tier (BST) rate.. <br />Table 3 <br />Yeaz BST Rate +/- De]ta <br />2000 $10.57 <br />2001 $11..92 $1.35 12.77% <br />2002 $11.70 ($0.22) -1.8J% <br />2003 $12,53 $0.83 7..09% <br />2004 $13.42 $0.89 7.10% <br />2005 $13.61 $0.19 1.42% <br />Table 4 <br />BST - MPR Up Grade Charge Combined MPIZ <br />$13.61 $2.11 $15.72 <br />