Browse
Search
Agenda - 05-03-2005-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 05-03-2005
>
Agenda - 05-03-2005-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:03:16 AM
Creation date
8/29/2008 10:19:05 AM
Metadata
Fields
Template:
BOCC
Date
5/3/2005
Document Type
Agenda
Agenda Item
5j
Document Relationships
RES-2005-036 Adoption of 2005 Rate Order for Cable Services in Unincorporated Orange County
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-2- <br />FINDINGS <br />Time Wazner Cable's FCC Cable Rate Filing: On September .30, 2004, Time Wamer Cable <br />(TWC) submitted a form FCC1240-Basic Cable Service Tier to set a new regulated rate for basic <br />cable service. It requested to continue the rate set in its initial Federal Communications <br />Coaunission (FCC) form 1.2.35-Abbreviated Cost of Service Network Upgrade Charge filed five <br />yeazs ago. TWC also submitted a form 1205-Equipment and Installafion Chazges to set new <br />regulated rates for equipment rental and installation services. These documents were submitted <br />to the County for approval. <br />TWC's proposed Maximum permitted rate for the Basic Service Tier (BST) of NC-0.276a in <br />2005 is $10.26. Cnstomers pay the BST plus the "Add-nn" Cost of Service Network Upgrade <br />Charge of $1.81. TWC's proposed monthly combined rate is $12.07 (see Table 2). The <br />"selected"combined rate is $11..55; that is $0.521ess than the maximum permitted rate. <br />The next table chronicles changes in the regulated Basic Service Tier (BST) rate. <br />Table 1 <br />Year BSI Rate +/- Delta <br />2000 $8.75 <br />2001 $9.91 $1.16 13,26% <br />2002 $9.62 ($0.29) -2.93% <br />2003 $10,40 $0.78 8.11% <br />2004 $10.76 $0..36 3 46% <br />2005 $10.26 ($0.50) -4.65% <br />Table Z <br />BST - MPR Up Grade Chazge Combined MPR <br />$lOZ6 $1.81 $12.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.