CHANGE ORDER NO.: 4 <br />Page 2 of 4 <br />40 <br />Re- staking of additional <br />LS <br />1 <br />$500.00 <br />$500.00 <br />areas due to homeowner <br />removal <br />Total <br />$4,000.00 <br />0 The following shall be added to Section 0122 00, Unit Prices, Article 1.06: <br />"BB. Item 37 — Sewer Valve Boxes for Tracer Wire <br />1. Work Included: <br />a. Under this Item, the Contractor shall furnish all material, labor, and equipment for the <br />installation of a sewer valve box to contain the ends of the tracer wire located along the <br />PVC pipe installed from manhole SSMH -R3 to SSMH -R4, and from SSMH -R4 to SSMH- <br />R5. <br />b. Payment for this item will include, but not be limited to: <br />1) Excavating for valve box, backfilling including material as required, and restoration of <br />seeding as needed. <br />2. Basis of Payment: <br />a. The Contractor will be paid for the number of valve boxes installed and accepted by the <br />Owner. <br />3. Payment: <br />a. The unit price per valve box will be full compensation for providing all labor, materials, <br />and equipment as may be required for the execution of work of these Items, accepted and <br />complete." <br />Item 38 — Rip -Rap for Outfall L Ditch Crossing <br />1. Work Included: <br />a. Under this Item, the Contractor shall furnish and install permanent rip rap where new <br />pipeline crosses existing ditch. <br />b. Payment for this Item will include: <br />1) Required clearing, cleanup, and seeding. <br />2. Basis of Payment: <br />a. The Contractor will be paid on a lump sum basis, at the applicable Contract price as listed <br />in the itemized proposal. <br />3. Payment: <br />b. The lump sum price will be full compensation for providing all labor, materials, and <br />equipment as may be required for the execution of work of this Item, accepted and <br />complete." <br />"DD. Re- staking <br />Item 39 — Restaking of Ebi Property <br />Item 40 — Restaking of Other Areas <br />1. Work Included: <br />a. Under this Item, the Contractor shall have their subcontractor re -stake those areas in which <br />the property owners removed the stakes on multiple occasions. <br />b. Payment for this Item will include, but not be limited to: <br />1) All required material, labor, and equipment necessary to perform the work. <br />