Browse
Search
2018-535 Planning - Moffat Pipe change order 4
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-535 Planning - Moffat Pipe change order 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:59:28 PM
Creation date
9/11/2018 9:42:33 AM
Metadata
Fields
Template:
Contract
Date
9/5/2018
Contract Starting Date
7/10/2017
Contract Ending Date
10/27/2018
Contract Document Type
Contract Amendment
Amount
$4,000.00
Document Relationships
2018-085 Planning - Moffat Pipe Rogers Road sewer expansion change order 2
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-116 Planning - Moffat Pipe Change Order #3
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-612 Planning - Moffat Pipe change order 5
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-720 Planning - Moffat Pipe amendment 6
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2019-173 Planning - Moffat Pipe change order 8
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-352 Planning - Moffat Pipe change order 5
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-535 Planning - Moffat Pipe change order 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
R 2018-612 Planning - Moffat Pipe change order 5
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO.: 4 <br />Page 2 of 4 <br />40 <br />Re- staking of additional <br />LS <br />1 <br />$500.00 <br />$500.00 <br />areas due to homeowner <br />removal <br />Total <br />$4,000.00 <br />0 The following shall be added to Section 0122 00, Unit Prices, Article 1.06: <br />"BB. Item 37 — Sewer Valve Boxes for Tracer Wire <br />1. Work Included: <br />a. Under this Item, the Contractor shall furnish all material, labor, and equipment for the <br />installation of a sewer valve box to contain the ends of the tracer wire located along the <br />PVC pipe installed from manhole SSMH -R3 to SSMH -R4, and from SSMH -R4 to SSMH- <br />R5. <br />b. Payment for this item will include, but not be limited to: <br />1) Excavating for valve box, backfilling including material as required, and restoration of <br />seeding as needed. <br />2. Basis of Payment: <br />a. The Contractor will be paid for the number of valve boxes installed and accepted by the <br />Owner. <br />3. Payment: <br />a. The unit price per valve box will be full compensation for providing all labor, materials, <br />and equipment as may be required for the execution of work of these Items, accepted and <br />complete." <br />Item 38 — Rip -Rap for Outfall L Ditch Crossing <br />1. Work Included: <br />a. Under this Item, the Contractor shall furnish and install permanent rip rap where new <br />pipeline crosses existing ditch. <br />b. Payment for this Item will include: <br />1) Required clearing, cleanup, and seeding. <br />2. Basis of Payment: <br />a. The Contractor will be paid on a lump sum basis, at the applicable Contract price as listed <br />in the itemized proposal. <br />3. Payment: <br />b. The lump sum price will be full compensation for providing all labor, materials, and <br />equipment as may be required for the execution of work of this Item, accepted and <br />complete." <br />"DD. Re- staking <br />Item 39 — Restaking of Ebi Property <br />Item 40 — Restaking of Other Areas <br />1. Work Included: <br />a. Under this Item, the Contractor shall have their subcontractor re -stake those areas in which <br />the property owners removed the stakes on multiple occasions. <br />b. Payment for this Item will include, but not be limited to: <br />1) All required material, labor, and equipment necessary to perform the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.