2018-535 Planning - Moffat Pipe change order 4
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-535 Planning - Moffat Pipe change order 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:59:28 PM
Creation date
9/11/2018 9:42:33 AM
Metadata
Fields
Template:
Contract
Date
9/5/2018
Contract Starting Date
7/10/2017
Contract Ending Date
10/27/2018
Contract Document Type
Contract Amendment
Amount
$4,000.00
Document Relationships
2018-085 Planning - Moffat Pipe Rogers Road sewer expansion change order 2
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-116 Planning - Moffat Pipe Change Order #3
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-612 Planning - Moffat Pipe change order 5
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-720 Planning - Moffat Pipe amendment 6
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2019-173 Planning - Moffat Pipe change order 8
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-352 Planning - Moffat Pipe change order 5
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-535 Planning - Moffat Pipe change order 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
R 2018-612 Planning - Moffat Pipe change order 5
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO.: 4 <br />Page 1 of 4 <br />101: KIM" <br />CHANGE ORDER NO.: 4 DATE: September 5, 2018 <br />Project: Historic Rogers Road Sewer Expansion Project <br />Contractor: Moffat Pipe, Inc. <br />Engineer /Architect: URS Corporation — North Carolina <br />CONTRACTOR is directed to make the following changes in the Contract Documents. <br />Description: <br />Moffat Pipe, Inc. is requesting the following revisions to the substantial completion and final completion <br />dates of the contract to account for delays in the project considered to be no fault of their own and beyond <br />their control. Moffat Pipe, Inc. is requesting an additional 18 calendar days. The requested number of <br />additional contract days are as follows: 17 calendar days for weather delays experienced between March <br />235 2018 and August 20, 2018, and one (1) calendar day associated with the additional work for items <br />requested by OWASA on the May 25, 2018 punch list walkthrough. The requested number of delay days <br />does not account for potential future delays, or delays associated with other concerns not specifically <br />mentioned herein. <br />Moffat Pipe, Inc. is also requesting an additional $4,000.00 to compensate them for two items identified <br />and requested by OWASA on the May 25, 2018 punch list walkthrough, and additional staking due to <br />homeowners removing surveyors stakes on multiple occasions. A more detailed explanation of each of the <br />requested revisions to the Contract Price is below. <br />1) The two items identified on the punch list walkthrough that are not covered under the original <br />construction contract are the addition of rip rap along the second stream crossing and spring well <br />located on the Glenbrooke HOA property, and four (4) sewer valve covers for the tracer wire along <br />the PVC pipe in Outfall R. An additional day for this work has already been included in the itemized <br />list of delays listed seen in Attachment A. <br />2) Moffat Pipe was required to call out their subcontractor to re -stake easements approximately three <br />times in two different locations due to homeowners removing the stakes even though OWASA <br />communicated the need for the stakes and requested that homeowners not disturb them. <br />The following lines shall be added to Section 00 4144, Unit Price Contract Bid Form. <br />Item <br />Bid Description <br />Units <br />Estimated <br />Unit Price <br />Extended <br />No. <br />Quantity <br />Total <br />37 <br />Sewer Valve Boxes for <br />EA <br />4 <br />$125.00 <br />$500.00 <br />Tracer Wire <br />38 <br />Rip -Rap for Outfall L <br />LS <br />1 <br />$29500.00 <br />$2,500 <br />Ditch Crossing <br />39 <br />Re- staking of Ebi <br />LS <br />1 <br />$500.00 <br />$500.00 <br />Property <br />