Browse
Search
SWAG agenda 110415
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Solid Waste Advisory Group
>
Agendas
>
2015
>
SWAG agenda 110415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2018 4:41:54 PM
Creation date
9/10/2018 4:27:50 PM
Metadata
Fields
Template:
BOCC
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COSTS <br />• Capital: up to $600 per annual ton of <br />capacity <br />• Operating: <br />• Aerobic processing: $60 to $120 per ton (can <br />be lower depending on local factors) <br />• Anaerobic Digestion: $90 to $150 per ton <br />• Range varies due to economies of scale, <br />extent of odor control requirements, <br />preprocessing requirements <br />• Offsets for carbon credits, low carbon fuel, <br />etc. can reduce cost <br />—L <br />,WW- - -%� <br />IMIIIIM <br />
The URL can be used to link to this page
Your browser does not support the video tag.