Orange County NC Website
•Y <br />ICBM <br />conveyors, etc., additional equipment adds to the number of separate process and <br />associated equipment necessary for operation. The Tel Aviv installation of Arrow has <br />thus far experienced many shut -downs due to the presence of troublesome <br />components in the input waste stream. To combat this, a higher level of pre- <br />processing is being implemented so that future applications can operate more <br />reliably. <br />Figure B -14. ArrowBio Facility in Haifa <br />GBB/C08027 -01 B -21 August 15, 2008 <br />