Browse
Search
SWAG agenda 042215
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Solid Waste Advisory Group
>
Agendas
>
2015
>
SWAG agenda 042215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2018 4:35:48 PM
Creation date
9/10/2018 4:24:53 PM
Metadata
Fields
Template:
BOCC
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113 <br />Comprehensive Review of <br />Solid Waste Collection and Disposal Options <br />years. Exhibit 12 -18 presents a visual summary comparison of the tipping fees estimated for the <br />alternative WC technologies in the L.A. County studies and the tipping fees for operating WTE <br />plants. The graph shows that the appropriate "average" tipping fee for a WTE plant is about $60 <br />per ton. The estimated "low" and "high" range is estimated to be from about $35 to $80 per ton, <br />respectively. <br />Exhibit 12-18. Summary of Tipping Fee Range for Technologies <br />200 <br />c 160-1 — - - <br />D <br />140 Approx. national <br />120 average $60 /ton + <br />100 ' — <br />0 80 <br />w <br />60 / — <br />CL 40 <br />~ 20 <br />Thermal(1) Thermal(2) Biological(2) <br />(WTE only) (Alternative Processes) (Anaerobic) <br />Technology <br />(1 ) Existing operating plants. Le end <br />(2) Proposed demonstration, small -scale Low end <br />plants only. (B plants total) High end <br />The tipping fee ranges for alternative technologies are provided as a crude comparison to the <br />WTE tipping fee. A large tipping fee range, from low to high, is evident. These plots reflect <br />expected uncertainties and risks at the time of the studies, which would not be unusual for <br />technology that is still in the development or pilot plant stages. Most WTE plants in the U.S. <br />have a capacity anywhere from 500 to about 4,000 tons per day and this affords them a valuable <br />"economy of scale" over the much smaller proposed alternative technologies. <br />Such a large range of tipping fees for alternative WC technologies may not actually be the case if <br />a study were done today. Projected tipping fees are a function of many regional cost- factors, <br />including: <br />• Power production/ quality and quantity of syngas; <br />+ Air emissions and treatment; <br />+ Market for by- products; <br />• Downtime/ equipment reliability; <br />• Pre - processing requirements (sorting equipment, NW, etc.); <br />• Operator experience; <br />• Financial contributions by vendor; <br />v2.1 i79 10/22/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.