Orange County NC Website
33 <br />Orange County, NC <br />Financial Plan and Rate Study for Solid Waste Enterprise Fund <br />• Scenario 5 — This scenario serves as an assessment of the required increase in the <br />contribution from the General Fund to balance projected operating expenses and <br />revenues for solid waste and recycling services if the Program Fee was permanently <br />eliminated effective in FY 2016 -17. It is assumed that the revenue to enable this <br />contribution would be generated by a Property Tax Rate increase. <br />• Scenario 6 — This scenario incorporates the revenues and expenses associated with a <br />hypothetical transfer station constructed and operated by Orange County and centrally <br />located (Eubanks Road area) to current County solid waste operations and the Towns <br />of Chapel Hill, Carrboro, and Hillsborough. For purposes of the Model, revenues and <br />expense assumptions remain the same as in Scenario 1, and the approximated annual <br />net revenue from the transfer station is calculated and added to current revenues as <br />shown in Hypothetical Transfer Station Net Revenue Estimate (Appendix G). This <br />scenario then assesses the required Program Fee to balance the Fund's annual budget <br />and thus serves a break -even analysis. <br />• Scenario 7 — This scenario mimics Scenario 1 ( "Status Quo ") but assumes a <br />"phasing -out" of the annual General Fund Contribution and a gradual increase of the <br />Program Fee over the next 5 years. The respective Program Fee and General Fund <br />Contribution figures used for FY 2016 -17 through FY 2020 -21 are shown in Exhibit <br />12. <br />Exhibit 12. Scenario 7 Phase -Out of General Fund Contribution <br />and Increase of Solid Waste Programs Fee <br />Revenue Source <br />FY 2016 -17 <br />FY 2017 -18 <br />FY 2018 -19 <br />FY 2019 -20 <br />FY 2020 -21 <br />Solid Waste Programs Fee <br />$107 <br />$148.42 <br />$158.63 <br />$157.79 <br />$186.14 <br />General Fund Contribution <br />$2,004,719 <br />$1,500,000 <br />$1,000,000 <br />$500,000 <br />$0 <br />With the exception of Scenario 7, the six Model scenarios each have two iterations (sub - <br />scenarios) as described below: <br />• Sub - Scenarios A, modeled without General Fund Contribution; and, <br />• Sub - Scenarios B, modeled with General Fund contribution. <br />Note that Scenario 6, the transfer station scenario, includes additional sub - scenarios A.1, A.2, <br />B.1, and B.2. The sub - scenarios 1 and 2 correspond to hypothetical transfer station operations in <br />which waste is accepted from 1) only Orange County and the three Towns and 2) Orange <br />County, the three Towns, and other waste disposers, respectively. <br />2.1.8 Model Results <br />Exhibit 13 shows the Modeled Budgetary Gap for the initial iteration for each of these seven <br />scenarios, which reflects sub - scenario "A" (without General Fund contribution). In addition to <br />developing the Test Year revenue requirements, SCS forecasted the annual revenue requirement <br />20 <br />