Orange County <br />March 23, 2016 <br />Page 4 of 11 <br />7 <br />(waste supply), <br />and Essroc Cement Company (fuel off - taker). <br />The <br />project <br />participants are all equity <br />members in the <br />special purpose project company formed to own <br />and <br />operate <br />the facility! <br />The Entsorga facility is permitted to accept up to 500 tons per day, 9,999 tons per month, of incoming <br />MSW8. The facility utilizes the MBT process to stabilize the raw waste, to recover high value scrap metal, <br />and to produce a homogenous, high energy value, fuel product solid recovered fuel called SRF. The <br />production process takes about 14 days, explained below, from the receipt of raw MSW to the shipment <br />of finished SRF. <br />At the facility, route collection vehicles will discharge their waste loads into a pit inside an enclosed waste <br />receiving hall. The hall will be equipped with high speed roll up doors as a part of the facility's overall odor <br />management system. An overhead crane will retrieve waste from the receiving pit and load it onto a <br />conveyor feeding a rotating screen. The rotary screen will divide the waste into two fractions, oversized <br />and undersized. The oversized fraction, consisting mostly of dry paper and plastics will be directed to the <br />SRF production line. The undersized fraction, rich in wet organic material, will be placed into a biological <br />stabilization pit by the overhead crane system. In this stabilization pit, warm air will be forced through <br />waste pile enhancing biological degradation and drying the material. Exhaust air from the stabilization <br />process, and the balance of the plant, will directed to a bio- filter for odor control. After 10 to 14 days, the <br />organics within the waste pile have been stabilized and an overhead crane will remove the dried stabilized <br />waste from the pit and feed it into the SRF production line. Apple Valley already has a materials recovery <br />facility to process clean, source separated recyclables, so no additional recovery of recyclable material, <br />other than metals, is included at the Entsorga facility. <br />At the SRF production line, shown in the diagram in Figure 1, oversized material from the pre - processing <br />section, and dried stabilized undersized material will be passed under magnets and eddy current devices <br />to recover valuable metals. The balance of the combined streams will be fed to a shredding system for <br />final size reduction. After shredding, the SRF will be held in a storage pit until it is loaded into trucks for <br />transport to the fuel user. <br />Berkeley County Solid Waste Authority, Findings of Fact and Conclusions of Law, January 24, 2013. <br />http: / /berkelevwv .ore /sharedimg /bcswa /13.pdf <br />8 Procedural Order, Case No 12- 0803 - SWF -CN Case No 12- 0803 - SWF -CN, Public Service Commission of West <br />Virginia, January 15, 2013. http: / /www.psc.state.wv.us/ scripts /orders /ViewDocument.cfm ?Case <br />Act ivity I D= 360476 &Source = Docket <br />AL" AOWFNS <br />4 GBB/C15099 -02 <br />CONSULTANTS <br />