Browse
Search
2018-542-E DEAPR - SME Soil Boring contract for former Fairview Landfill
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-542-E DEAPR - SME Soil Boring contract for former Fairview Landfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2018 2:47:18 PM
Creation date
9/10/2018 2:25:07 PM
Metadata
Fields
Template:
Contract
Date
9/24/2018
Contract Starting Date
10/1/2018
Contract Document Type
Agreement - Consulting
Amount
$74,927.00
Document Relationships
R 2018-542 DEAPR - SME soil borings for former Fairview Landfill
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FE562994- 247A- 4BEF- A63A- 074755E44AEB <br />1. Complete soil borings to determine the horizontal extent of landfill waste materials at <br />the former Hillsborough Landfill in a reasonable timeframe and in accordance with a Work Plan <br />approved by the NC DEQ DWM Inactive Hazardous Sites Branch. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />3.1.3 Should County reasonably determine that Consultant has not met the Milestone <br />Dates established in Section 3.1.2 of this Article, County shall notify Consultant of the failure to <br />meet the Milestone Date. The County, at its discretion may provide the Consultant seven (7) <br />days to cure the breach. County may withhold the accompanying payment without penalty until . <br />such time as Consultant cures the Breach. In the alternative, upon Consultant's failure to meet <br />any Milestone Date the County may modify the Milestone Date schedule. Should Consultant or <br />its representatives fail to cure the breach within seven (7) days, or fail to reasonably agree to <br />such modified schedule County may immediately terminate this Agreement in writing without <br />penalty or incurring further obligation to Consultant. This section shall not be interpreted to <br />limit the definition of breach to the failure to meet Milestone Dates. <br />ARTICLE 4 DURATION OF SERVICES <br />4.1 Scheduling of Services <br />4.1.1 The Consultant shall schedule and perforce his activities in a timely manner so as <br />to meet the Milestone Dates listed in Article 3. <br />4.1.2 Should the County determine that the Consultant is behind schedule, it may require <br />the Consultant to expedite and accelerate his efforts, including providing additional resources <br />and working overtime, as necessary, to perform his services in accordance with the approved <br />project schedule at no additional cost to the County. <br />4.1.3 The Commencement Date for the Consultant's Basic Services shall be October 1, <br />2018. <br />ARTICLE 5 COMPENSATION <br />5.1 Compensation for Basic Services <br />5.1.1 Compensation for Basic Services shall include all compensation due the <br />Consultant from the County for all services under this Agreement except for any authorized <br />Reimbursable Expenses which are defined herein. The maximum amount payable for Basic <br />Services is seventy four thousand, nine hundred twenty seven Dollars ($74,927.00). Payment for <br />Basic Services shall become due and payable in direct proportion to satisfactory services <br />performed and work accomplished. Payments will be made as percentages of the whole as <br />Revised 10117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.