Browse
Search
2018-542-E DEAPR - SME Soil Boring contract for former Fairview Landfill
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-542-E DEAPR - SME Soil Boring contract for former Fairview Landfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2018 2:47:18 PM
Creation date
9/10/2018 2:25:07 PM
Metadata
Fields
Template:
Contract
Date
9/24/2018
Contract Starting Date
10/1/2018
Contract Document Type
Agreement - Consulting
Amount
$74,927.00
Document Relationships
R 2018-542 DEAPR - SME soil borings for former Fairview Landfill
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FE562994- 247A- 4BEF- A63A- 074755E44AEB <br />Proposal for Waste Disposal Area Delineation <br />1° s <br />irr Hillsborough Dump <br />A rA r err ID No. NONCDO000483 <br />Task Orders 483DP -1, 2 and 3 <br />1.2.3 Subtask C Project Ma)iagement, Coordination & Support <br />.Project Management, Coordination and Support services include; <br />0 Tasks and deliverables required prior to commencing field services; <br />� Development of site specific field sampling forms and logs. <br />f Procurement and coordination of subcontractors. <br />Coordination with drillers to ensure that soil boring supplies and decontamination materials are <br />prepared. <br />Provide project management and technical support to the field sampling teams. <br />* Provide project management and communication with NCDEQ and Orange County. <br />1,3 Task 483DP -3 Compile Remedial Investigation - Delineation Phase Report <br />S &ME will compile a report that includes the findings of the items listed above for the scope of services. The <br />following sections and information will be included in the report: <br />Explanation of services performed and the findings. <br />A section concerning any variations from the work plan or the SOPs. <br />a Tables summarizing field data, GPS coordinates of all boring locations. <br />Figures presenting boring locations and a revised waste disposal area boundary. <br />Copies of original field notes. <br />n Boring logs. <br />We will submit a digital copy (.pdf) of the report as required. <br />April 12, 2018 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.