Orange County NC Website
DocuSign Envelope ID: FE562994- 247A- 4BEF- A63A- 074755E44AEB <br />Budget Estimate <br />Hillsborough Dump <br />Remedial Investigation -Waste Delineation <br />Site ID: NONCDO000483 <br />Task Order: 483DP -2A <br />NCDEQ Contact: Zi -Qiang Chen, PhD <br />S &ME Project No. 4305 -17 -061 <br />S &ME Proposal No. 43- 1600767, Change Order No. 2 <br />page 1 of 1 <br />Prepared: June 18, 2018 <br />Totals <br />Subtask A - Waste Delineation Borings (54) (4 Field Days) <br />S &ME Drilling Fees <br />Mobilization of geoprobe and crew <br />1 <br />mob <br />at <br />S 350.00 <br />1 <br />mob <br />$ 350.00 <br />$16,097.70 <br />Geoprobe Daily Rate <br />4 <br />days <br />at <br />$ 2,000.00 <br />/ <br />day <br />$ 8,000.00 <br />Drums <br />4 <br />drums <br />at <br />$ 55.00 <br />/ <br />each <br />$ 220.00 <br />Per Diem <br />3 <br />nights <br />at <br />$ 260.00 <br />/ <br />day <br />$ 780.00 <br />Staff Professional (prep, travel & on -site logging, staking boundary, GPS) <br />48 <br />hours <br />at <br />$ 85.00 <br />/ <br />hour <br />$ 4,480.00 <br />CAD Operator (cost adi, download data, develop site maps for report) <br />4 <br />hours <br />at <br />$ 65.00 <br />/ <br />hour <br />$ 260,00 <br />Staff Professional (data review, develop report text, tables, maps, boring logs) <br />8 <br />hours <br />at <br />$ 85.00 <br />/ <br />hour <br />$ 684.00 <br />Mileage IRoundirlp from S &ME's Raleigh office (100) +dally mileage (101day)l <br />140 <br />miles <br />at <br />$ 0.555 <br />1 <br />mile <br />$ 77.70 <br />Per Diem (1 Staff - 3 nights) <br />3 <br />nights <br />at <br />$ 130.00 <br />1 <br />day <br />$ 390.00 <br />Global Positioning System (GPS) Unit (Trimble GeoXH) <br />4 <br />days <br />at <br />$ 160.00 <br />1 <br />day <br />$ 640.00 <br />Landfill Gas Meter (HASP) <br />4 <br />days <br />at <br />$ 125.00 <br />/ <br />day <br />$ 500.00 <br />Field Expendables <br />4 <br />days <br />at <br />$ 30.00/ <br />day <br />$ 120.00 <br />Subtask B - Project Management, Coordination and Support (4 Field Days) <br />Project Professional (budget est., review figs, Dally Follow- Upwith Field Crews and 12 hours at $ 100.00 1 hour $ 1,200.00 <br />Count and Unit PM roiect management and invoicing) $1,298.00 <br />Administration 2 hours at $ 49.04 / hour $ 98.00 <br />Total Proposed Task Order 483DP -2A Budget 0- <br />$17,895.70 <br />Scone of Services: <br />As discussed in email correspondence dated June 16, 2018 between S &ME, the County, and the Unit, S &ME proposes to advance approximately 54 waste <br />delineation borings during an estimated four -day field event by the methods described in Task Order 483DP -2 dated April 12, 2018 and authorized for <br />reimbursement to the County by the Pre - Regulatory Landfill Unit (Unit) in a letter dated May 1, 2018. The purpose of this task order is to further delineate buried <br />waste and fill at selected locations based on review of the Task Order 483OP -2 field results and mapping, historical photos and on-site observations. The <br />approximate locations of proposed drilling areas are shown on the attached Figure 1. Results of the 483DP -2A delineation phase activities will be incorporated <br />in the Task Order 483DP -3 report. <br />