Browse
Search
SWAG agenda 013017
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Solid Waste Advisory Group
>
Agendas
>
2017
>
SWAG agenda 013017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2018 9:32:18 AM
Creation date
9/10/2018 9:31:06 AM
Metadata
Fields
Template:
BOCC
Date
1/30/2017
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Concrete Retaining Walls: All walls reduced fi-om 12- inches to 9- inches thick. <br />Reinforcement to remain as originally designed. <br />10. Extend Bid Prices: Due to negotiation time frame and need to gain County <br />Administration approval for project, bid prices will be held an additional 60 days <br />(February 8.2017). <br />Total negotiated new contract price for all work and negotiated items is to be Three Million One <br />Hundred Thousand Dollars ($3,100,000.00). <br />By signature below, all parties are in agreement with the negotiated scope and contract price: <br />Engineer: Contractor: Owner: <br />IV ZZ2:6 1 ILA <br />Signafure Pq f Signatu a Signature <br />C. Tyros Clayton, Jr, PE Manager Gordon Dively, PE <br />Draper Aden Associates D. H. Griffin Infrastructure, LLC Orange County Solid Waste <br />Attachments: 1. Haul Road Exhibit <br />2. New Site Layout - Pavement Revisions (Sheet C6.0) <br />3. Revised Pavement Sections <br />4. Revised Concrete Details (Sheet C6.2) <br />C: WxnW[ Ne��AppUnlN .onRMlmull\ \VinJW6Tenrymuy humel Fllee nleI11MI100MQX3O 1%fMF 16 1109 MamomnMlu NV9901Mion CTC Jr FWW,dA0" <br />
The URL can be used to link to this page
Your browser does not support the video tag.