Orange County NC Website
d Look at the feas'ibiliq+ oJrelocaling dre "stadium freld" to the south with the pmk <br />Addre-ss minor rrrodrfications needed ns n resrdt of the nbove inork, for dre locutions of odrer schools ividria <br />the schools campus arrd pmk facilities within the pmk site <br />After two meetings, the Work Group issued its findings: <br />1, Relocation of Stadium/track: While there might be benefits to locating the <br />proposed stadium/track in the park, the Work Group felt that the need for keeping <br />the stadium/track with the middle school that is planned for the northern part of <br />the site was an overriding consideration, for programming reasons. Complicating <br />factors based on topography and stream buffers were also noted. The Work <br />Group did propose a proposed t/3-mile loop trail around the meadow as an <br />alternative to meet the needs for a measured walking or running trail. <br />2. Action Sports: While there does appear to be a need for such a facility as a BMX <br />bike trail, the Work Group noted that the other proposed park facilities have been <br />identified as needs by both the original work group and individual parks advisory <br />boards, and that these -plus the concept of a community gymnasium -would <br />appear to be a higher priority. That said, staff identified a potential area within the <br />Piedmont EMC powerline easement that might be able to serve as such a facility, <br />and the Work Group forwards that concept to the Board to consider further, as <br />desired. <br />3. Elementary School (ES) #10: The Work Group found that its current location <br />adjacent to the proposed future middle school was preferable to the possible <br />location in the southeastern corner of the site. In general, the Work Group feels <br />that the benefits of co-locating the two schools together, which can only occur on <br />the educational campus in the northern portion of the site, outweigh the benefits <br />of possible increased walkability far ES #1 Q in a southeastern location. Keeping <br />the elementary school and middle school together offers synergies for shared <br />supervision, food services, media centers, and other possible advantages, <br />4, Other minor modifications to the Master Plan: <br />a. A footprint of a possible Action Sports (BMX bike course) in the Piedmont <br />EMC easement, which would need to be explored further with PEMC and <br />the Board of Commissioners, if desired. <br />Qn May 3rd, the Board is scheduled to consider adoption of a master plan, receipt <br />of requested information about infrastructure costs and phasing, and authorize <br />the submittal of a Conditional Use Permit application to the Town of Carrboro, <br />Preparation of the permit materials is expected to take 4-6 months, with review <br />and consideration of the CUP projected to take approximately one year, <br />EvLViI ~H,vzcdh.E GlvrGl F2BSOttl2E COrhSCr'VLItiON. <br />PO Sax 315'Y /s0G ,~} RCVZrZ 12oG7d <br />Hill56or ocr~N; Nc ~,=2~1 <br />~Z~) 2 f5-25J0 <br />