<br /> Comprehensive Review of
<br /> S olid W aste Collection and Disposal Options
<br />
<br />
<br />v2.1 152 10/22/12
<br />Exhibit 11 -8. Estimated Annual O&M Cost for
<br />Regional Landfill Scenario
<br />1 Personnel Salaries 8 LS 50,000$ 400,000$
<br />2 Personnel Benefits 8 LS 15,000$ 120,000$
<br />3 Landfill Equipment Debt Service 7 LS 40,000$ 280,000$
<br />4 Landfill Equipment Maintenance/ Repair 7 LS 7,500$ 52,500$
<br />5 Equipment - Lease/ Rental 1 LS 15,000$ 15,000$
<br />6 Vehicle Fuel 40,000 Gal 3.50$ 140,000$
<br />7 Vehicle Supplies 1 LS 10,000$ 10,000$
<br />8 Leachate Treatment 3,000,000 Gal 0.03$ 90,000$
<br />9 Landfill Gas Operations 1 LS 20,000$ 20,000$
<br />10 Erosion Control/ Seeding 1 LS 30,000$ 30,000$
<br />11 Stone 1 LS 15,000$ 15,000$
<br />12 Soil Cover and ADC 1 LS 50,000$ 50,000$
<br />13 Electricity & Heating 1 LS 15,000$ 15,000$
<br />14 Water & Sewer 1 LS 2,500$ 2,500$
<br />15 Telecommunications/ Information Technology 1 LS 5,000$ 5,000$
<br />16 Vehicle Insurance 1 LS 5,000$ 5,000$
<br />17 General/ Environmental Insurance 1 LS 5,000$ 5,000$
<br />18 Engineering/ Consulting Services 1 LS 75,000$ 75,000$
<br />19 Environmental Monitoring Services 1 LS 75,000$ 75,000$
<br />20 Legal Services 1 LS 10,000$ 10,000$
<br />21 Mowing & Other Contracting Services 1 LS 20,000$ 20,000$
<br />22 Dues & Association Fees 1 LS 3,000$ 3,000$
<br />23 Permit Fees & Excise Tax 1 LS 135,000$ 135,000$
<br />24 Office Supplies 1 LS 2,000$ 2,000$
<br />25 Janitorial 1 LS 2,000$ 2,000$
<br />26 Operations & Maintenance Supplies 1 LS 5,000$ 5,000$
<br />27 Uniforms 1 LS 2,000$ 2,000$
<br />28 Miscellaneous Maintenance/ Repair 1 LS 15,000$ 15,000$
<br />-$
<br />SUBTOTAL 1,599,000$
<br />CONTINGENCY (20%)319,800$
<br />TOTAL ESTIMATED ANNUAL OPERATING COST 1,918,800$
<br />WASTE ACCEPTANCE RATE (Average Annual)65,000 tpy
<br />ANNUAL OPERATING COST PER TON 29.52$
<br />No.Item Description Quantity Unit
<br />Engineer's
<br />Unit Price Est.
<br />Engineer's
<br />Total Estimate
<br />
<br />
<br />
<br />11.1.5 Closure and Post -Closure Care Cost Estimates
<br />Closure and post-closure care costs would need to be accrued on an annual basis to fund the
<br />closure and post-closure care requirements. Closure costs include the costs to close the entire
<br />landfill upon achievement of final grades. Typically, landfills are closed on a phased basis, but
<br />for the purpose of this analysis, SCS estimated the total closure costs and amortized these costs
<br />over the 30-year projected life of the landfill. The closure costs were developed based on
<br />estimated costs to construct a composite final cover system (low permeability soil and
|