Orange County NC Website
<br /> Comprehensive Review of <br /> S olid W aste Collection and Disposal Options <br /> <br />v2.1 132 10/22/12 <br />Exhibit 9 -2. Estimated Cost to Develop a New Transfer Station/ <br />Materials Recovery Facility <br />LABOR <br /> MATERIAL & <br />EQUIPMENT <br />DESCRIPTION UNIT QUANTITY COST SUBTOTAL TOTAL <br />PRE-DEVELOPMENT COSTS <br />Land Acquisition / Purchase ac 5 $0 $0 <br />Permitting ls 1 $150,000 $150,000 <br />Engineering, Legal, & Admin ls 1 $475,000 $475,000 <br />$625,000 <br />CONSTRUCTION <br />Mobilization/Demobilization ls 1 $101,000 $101,000 <br />$101,000 <br />EROSION CONTROL <br />Clearing and Grubbing ac 5 $6,000 $30,000 <br />Erosion Control Measures ls 1 $15,000 $15,000 <br />Site Restoration (seeding/mulching/vegetation)ls 1 $10,000 $10,000 <br />$55,000 <br />BUILDING COSTS <br />Site Work (Excavation, Grading, Paving, and Landscaping)sf 108,900 $6.50 $707,850 <br />Utilities (Electrical, Water, Sewage, Storm water)sf 13,600 $2.00 $27,200 <br />Structures (Concrete, Structural, Doors, Fire control, Lighting, Roof)sf 13,600 $35.00 $476,000 <br />$1,211,050 <br />EQUIPMENT COSTS <br />Conveyor & Sorter ls 1 $125,000 $125,000 <br />Separator ls 1 $40,000 $40,000 <br />Baler ls 1 $150,000 $150,000 <br />$315,000 <br />OTHER SITE WORK <br />Maintenance Building ls 1 $15,000.00 $15,000 <br />Scalehouse ls 1 $150,000.00 $150,000 <br />Office Equipment (computer, supplies, telephone, etc.)ls 1 $7,500 $7,500 <br />Truck Scales ls 2 $50,000.00 $100,000 <br />Site Lighting sf 108,900 $0.50 $54,450 <br />Signage, Locking gate, Fencing ls 1 $30,000 $30,000 <br />Construction Quality Assurance & Certification (third-party)ls 1 $81,150 $81,150 <br />$438,100 <br /> TOTAL $2,745,150 <br />CONTINGENCY (20%)$549,030 <br />PRELIMINARY COST ESTIMATE TOTAL $3,294,000 <br /> <br />Compared to the estimated cost to develop a Town-Only transfer station, as presented in Section <br />7, the incremental cost to include MRF capability is estimated to be approximately $915,000. <br />The majority of this incremental cost is attributed to additional equipment costs for materials <br />processing, along with building costs for a larger building footprint necessary to process and <br />manage the recoverable materials. <br />