Orange County NC Website
<br /> Comprehensive Review of <br /> S olid W aste Collection and Disposal Options <br /> <br />v2.1 105 10/22/12 <br />7.1.5 Summary of Transfer Station Development, Construction, <br />and Operations Costs <br />Exhibit 7-7 presents a summary of the estimated costs to develop, operate, close, and provide for <br />post-closure care for the Town-only and regional transfer station scenarios. This exhibit <br />demonstrates the importance of economies of scale in developing and operating a transfer <br />station. As depicted in the exhibit, operating a Town-only transfer station would be more costly <br />on a dollar per ton basis than operating a regional transfer station. This is attributed to the <br />economies of scale achieved by accepting greater waste quantities, while also sharing investment <br />of capital costs with a neighboring municipality or recovering a portion of the capital costs <br />through tip fees assessed to the neighboring municipality. <br /> <br />Note that Exhibit 7-5 and Exhibit 7-6 include the amortized costs for equipment as an annual <br />operating cost (refer to item 3 – Transfer Station Equipment Debt Service); whereas, Exhibit 7-7 <br />itemizes the equipment debt service costs separately. Also, note that the total estimated annual <br />operating costs and per ton operating costs in Exhibit 7-5 and Exhibit 7-6 are presented in current <br />dollars whereas the values presented in Exhibit 7-7 are in FY 2014-15 dollars to coincide with <br />anticipated commencement of transfer station operations. <br /> <br />Exhibit 7 -7. Summary of Estimated Transfer Station Costs <br />Town-Only <br />Transfer Station <br />Regional <br />Transfer Station <br />Cost Item Estimate Annual Cost $/ton Estimate Annual Cost $/ton <br />Pre-Development Cost, $$630,000 $49,000 --$630,000 $49,000 -- <br />Total Capital Construction Cost, $$1,749,000 $137,000 $11.76 $2,271,000 $167,000 $9.62 <br />Equipment Cost, $$276,000 $49,000 $3.10 $276,000 $49,000 $2.18 <br />Annual Operations Cost, $/year $325,000 $20.56 $442,000 $19.69 <br />Annual Haul Costs, $$160,000 $10.12 $246,000 $10.96 <br />Annual Disposal Costs, $$637,143 $40.30 $904,735 $40.30 <br />Annual Costs, $$1,357,143 $85.84 $1,857,735 $82.75 <br />Tonnage (2015)15,810 22,450 <br />Break Even Tip Fee, $/ton $85.84 $82.75 <br />7.1.6 Identified Target Destination Landfills <br />SCS reviewed several published resources to develop a list of viable target destination landfills <br />for the ultimate disposal of waste processed through this new transfer station evaluation <br />including the “Directory of Non-hazardous Waste Sites-2011” compiled by the Waste Business <br />Journal and cross-referenced to the listing of solid waste facilities currently permitted by <br />NCDENR. The Waste Business Journal Directory provided an electronically sortable list of <br />facilities for North Carolina and surrounding states which included pertinent information such as: <br /> Facility type (i.e., landfill, transfer station, MRF, etc.); <br /> Facility address; <br /> Owner/operator description (i.e., public or private); <br /> Contact information; <br /> Facility permit number; <br /> Daily average throughput (tons per day);