Orange County NC Website
<br /> Comprehensive Review of <br /> S olid W aste Collection and Disposal Options <br /> <br />v2.1 101 10/22/12 <br />Exhibit 7 -3. Estimated Cost to Develop a Town -Only Transfer <br />Station <br /> LABOR <br /> MATERIAL & <br />EQUIPMENT <br />DESCRIPTION UNIT QUANTITY COST SUBTOTAL TOTAL <br />PRE-DEVELOPMENT COSTS <br />Land Acquisition / Purchase ac 5 $0 $0 <br />Permitting ls 1 $100,000 $100,000 <br />Engineering, Legal, & Admin ls 1 $425,000 $425,000 <br />$525,000 <br />CONSTRUCTION <br />Mobilization/Demobilization ls 1 $70,000 $70,000 <br />$70,000 <br />EROSION CONTROL <br />Clearing and Grubbing ac 4 $6,000 $24,000 <br />Erosion Control Measures ls 1 $15,000 $15,000 <br />Site Restoration (seeding/mulching/vegetation)ls 1 $10,000 $10,000 <br />$49,000 <br />BUILDING COSTS <br />Site Work (Excavation, Grading, Paving, and Landscaping)sf 87,120 $6.50 $566,280 <br />Utilities (Electrical, Water, Sewage, Storm water)sf 10,000 $2.00 $20,000 <br />Structures (Concrete, Structural, Doors, Fire control, Lighting, Roof)sf 10,000 $35.00 $350,000 <br />$936,280 <br />OTHER SITE WORK <br />Maintenance Building ls 1 $10,000.00 $10,000 <br />Scalehouse ls 1 $150,000.00 $150,000 <br />Office Equipment (computer, supplies, telephone, etc.)ls 1 $7,500 $7,500 <br />Truck Scales ls 2 $50,000.00 $100,000 <br />Site Lighting sf 87,120 $0.50 $43,560 <br />Signage, Locking gate, Fencing ls 1 $25,000 $25,000 <br />Construction Quality Assurance & Certification (third-party)ls 1 $66,067 $66,067 <br />$402,127 <br /> TOTAL $1,982,407 <br />CONTINGENCY (20%)$396,481 <br />PRELIMINARY COST ESTIMATE TOTAL $2,379,000