<br /> Comprehensive Review of
<br /> S olid W aste Collection and Disposal Options
<br />
<br />v2.1 99 10/22/12
<br />Exhibit 7 -2. 20-Year Disposal Quantity Projections
<br />
<br />
<br />Projection
<br />Year
<br />Fiscal
<br />Year
<br />Town-Only
<br />MSW Quantities
<br />(tons)
<br />Town-Only
<br />MSW Throughput
<br />(tons/day)
<br />Regional
<br />MSW Quantities
<br />(tons)
<br />Regional
<br />MSW Throughput
<br />(tons/day)
<br />1 2015 15,810 76.0 22,450 107.9
<br />2 2016 16,060 77.2 22,810 109.7
<br />3 2017 16,310 78.4 23,160 111.3
<br />4 2018 16,580 79.7 23,540 113.2
<br />5 2019 16,860 81.1 23,940 115.1
<br />6 2020 17,130 82.4 24,320 116.9
<br />7 2021 17,400 83.7 24,710 118.8
<br />8 2022 17,690 85.0 25,120 120.8
<br />9 2023 17,980 86.4 25,530 122.7
<br />10 2024 18,260 87.8 25,930 124.7
<br />11 2025 18,580 89.3 26,380 126.8
<br />12 2026 18,870 90.7 26,800 128.8
<br />13 2027 19,170 92.2 27,220 130.9
<br />14 2028 19,490 93.7 27,680 133.1
<br />15 2029 19,800 95.2 28,120 135.2
<br />16 2030 20,120 96.7 28,570 137.4
<br />17 2031 20,450 98.3 29,040 139.6
<br />18 2032 20,780 99.9 29,510 141.9
<br />19 2033 21,110 101.5 29,980 144.1
<br />20 2034 21,470 103.2 30,490 146.6
<br />Totals 369,920 525,300
<br />Note: Regional MSW Quantities reflect a 42 percent increase compared to Town-Only Quantities
<br /> and are intended to represent the Town of Chapel Hill combined with the Town of Carrboro.
<br />
<br />7.1.2.2 Sizing an Appropriate Facility
<br />Hypothetical transfer station dimensions and waste throughput quantities were developed based
<br />on a number of assumptions regarding the maximum daily waste acceptance rate, facility
<br />configuration, traffic flow patterns, and setbacks to the property line from the transfer station
<br />building footprint.
<br />
<br />Assuming MSW collection occurs 4 days per week, 52 weeks per year, the daily MSW
<br />throughput quantities for a Town-only facility range from 75 tons per day (tpd) in FY 2014-15 to
<br />approximately 100 tpd in FY 2033-34. Thus, a new transfer station anticipated to accommodate
<br />the Town-only MSW generation for the next 20 years should be sized to manage 100 tpd. Based
<br />on SCS's experience, a transfer station sized to handle 100 tpd of MSW would require a building
<br />footprint in the 10,000 square foot (sf) range, situated on a site pad of at least 2 acres within a
|