Browse
Search
RES-2018-052 Resolution approving a policy for additional code enforcement inspections for residential projects
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2010-2019
>
2018
>
RES-2018-052 Resolution approving a policy for additional code enforcement inspections for residential projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2019 11:39:58 AM
Creation date
9/5/2018 8:56:53 AM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
6-c
Document Relationships
Agenda - 09-04-2018 6-c - Resolution Approving a Policy of Additional Inspections for Residential Projects
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deck final: This inspection recognizes that decks are often constructed by subcontractors <br />outside the typical final construction process. <br />Staff supports the flexibi|ity, with this inapeotion, to complete this portion of project prior to the <br />completed project. <br />Electrical pool bond- Residential ovvinnrning pools one unique projects that require specialized <br />verification of safety elements not found anywhere else in Residential construction. Pools are <br />normally installed by independent specialty contractors outside the construction processes of <br />the house itself. <br />Electrical change of service: When electrical power is upgraded due to renovations or <br />remodeling the re-establishment of that electrical power requires a special inspection vvhi|o <br />other work onthe electrical system continues. <br />Electrical service relocation- This inspection will address when an addition or renovation project <br />needs the existing electrical service location -to be moved to another part of the building and re- <br />energized for continued electrical power to other portions of the building. This allows a <br />temporary interruption of the power system in preparation for more extensive work to come. <br />Restore electrical service: Power can be interrupted to a Building or structure due to natural <br />disasters, fires, accident, vacancy or Power Company actions. Staff ia asked to inspect the <br />oyotanns for safety prior to authorizing the Utility Power Company to energize the system. <br />Plumbing final: Similar to rough-in inspections these trade subcontractors are independent from <br />the others and Staff wishes to offer the flexibility to schedule the inspection when the <br />preparations are completed. <br />EUectdoa|Unai Similar to Plumbing Final. <br />Mechanical final: Similar to Plumbing Final <br />Pool final: This inspection recognizes that pool subcontractors complete the pool installation <br />independently from the main building or before other phases of work being done by other <br />contractors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.