Browse
Search
RES-2018-052 Resolution approving a policy for additional code enforcement inspections for residential projects
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2010-2019
>
2018
>
RES-2018-052 Resolution approving a policy for additional code enforcement inspections for residential projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2019 11:39:58 AM
Creation date
9/5/2018 8:56:53 AM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
6-c
Document Relationships
Agenda - 09-04-2018 6-c - Resolution Approving a Policy of Additional Inspections for Residential Projects
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 of Resolution <br />Example of Inspections Being Required by Orange County <br />Below is the comprehensive list of Inspections Staff is requesting that the Orange County Board of <br />County Commissioners support and accept as policy which will be conveyed to the NC Building Code <br />Council for a request of approval: <br />Deck footing Modular marriage wall <br />Concrete form Brick lintel [bolted] <br />Foundation projection <br />Pre -brick / stone veneer <br />Water proofing <br />Temporary electrical [saw service] <br />Masonry fireplace <br />Temporary electrical final <br />Building pre -slab <br />Temporary mechanical final <br />Garage Slab <br />Building floor framing <br />Plumbing in slab <br />Deck final <br />Mechanical in slab I Electrical pool bond <br />Electrical in slab I Electrical change of service <br />Electrical in trench I Electrical service relocation <br />Plumbing in trench Factory fireplace <br />Mechanical in trench I Restore electrical service <br />Gas pipe in trench Plumbing final <br />Plumbing rough -in Electrical final <br />Mechanical rough -in I Mechanical final <br />Electrical rough -in I Pool fina <br />Gas pressure test <br />Requested Inspections: <br />Deck footing: Decks are often built toward the end of a project or by a separate subcontractor. <br />Having a separate inspection allows the Builder to schedule whenever this footing is ready. <br />Concrete forme Formed concrete and pre -cast foundations require additional inspection <br />considerations to accommodate multiple construction sequences and verification of <br />reinforcement or connections that may be in addition to other areas of the building system that <br />have conventional foundation systerns. This allows basements to be verified prior to crawl <br />space foundations being ready. <br />
The URL can be used to link to this page
Your browser does not support the video tag.