Browse
Search
Agenda - 04-28-2005-1b1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 04-28-2005
>
Agenda - 04-28-2005-1b1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:46:28 AM
Creation date
8/29/2008 10:17:24 AM
Metadata
Fields
Template:
BOCC
Date
4/28/2005
Document Type
Agenda
Agenda Item
1b1
Document Relationships
Minutes - 20050428
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />Comparison of Options <br /> Option A -Moving Ahead Option B -TIP Project <br />Roadway Two lanes with curb and gutter on Three lanes (one lane in each direction <br />Cross-Section one side and intersection and a center turn lane) with curb and <br /> improvements gutter on both sides and intersection <br /> im rovements <br />PedesU ian Sidewalk on west side of Smith Sidewalk on both sides of Smith Level <br />Faeilities Level Road. Road. <br />Bicycle Bike lane on west side of Smith Standard 4-foot bike lanes on both sides <br />Facilities Level Road; some pavement of Smith Level Road. <br /> widening on the east side (not a <br /> standard 4-foot bike lane). <br />Cost Estimate Right-of--way: $320,000 No cost estimate available. The draft <br /> Utilities relocation: Not known 2006-2012 TIP lists the following funds <br /> Construction: $1..7 million as available funds for the 4-lane design: <br /> Mitigation: $1..354 million <br /> Right-of--way and utilities: $600,000 <br /> Construction: $2.75 million <br />Cost to Town $300,000 over afive-year period for Approx. $66,300 (30 percent of cost of <br /> ri ht-of--way and utili relocation sidewalks) <br />Anticipated 1 to 2 years 3 % to 5 years <br />Beginning of <br />Construction <br />Enrergetrcy Bike lane and wide pavement will In addition to bike lanes on both sides of <br />Services provide space for' vehicles to pull the road which provide space for <br /> over, allowing emergency vehicles vehicles to pull to the curb, center turn <br /> to proceed through the center. lane will facilitate safe passage of <br /> emer enc vehicles. <br />Coordination Maybe possible to complete Construction will not begin prior to <br />with Carrboro construction prior to school opening school opening in August 2007. <br />Hi h School in Au ust 2007 <br />Impact orr If the Moving Ahead funds are used Not applicable. <br />Other Projects for Smith Level Road, these funds <br /> will not be available to build curb <br /> and gutter and a sidewalk on <br /> Homestead Road between High <br /> School and Ro ers roads <br />
The URL can be used to link to this page
Your browser does not support the video tag.