2018-523-E AMS - HH Architecture contract amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-523-E AMS - HH Architecture contract amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:57:39 PM
Creation date
8/31/2018 4:32:37 PM
Metadata
Fields
Template:
Contract
Date
8/20/2018
Contract Starting Date
4/5/2016
Contract Ending Date
3/31/2021
Contract Document Type
Contract Amendment
Amount
$554,450.00
Document Relationships
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
R 2018-523 AMS - HH Architecture contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />4.Bidding:AssumesConstruction Manager at Risk delivery method. Assist with <br />prequalification and bidding of the Construction Manager’s subcontractors. <br />B.Basic Design Phase 2 (estimatedSummer 2019start, pending progress on the <br />separate total site package) <br />1.Construction Administration(CA):Basic fee includes construction <br />administration for an estimated duration of ten(10) months.Assumes Construction <br />Manager at Risk delivery method.Perform architectural coordination, submittal <br />review, and related Construction Administration. Lead the pre-construction <br />meeting. Provide bi-weekly jobsite visits(up to 22visits anticipated)and lead <br />monthly construction meetings(up to 10meetings anticipated),punch listand final <br />inspection. <br />2.Closeout(CO):Record drawings and closeout of project. <br />5.Schedule <br />A.We understand the goal is for construction to begin in the Summer of 2019. The <br />following is an estimated schedule for the scope upon receipt of Notice to Proceed: <br />1.Schematic Design (SD)...............................................................8 weeks <br />2.SD Owner review........................................................................3 weeks <br />3.Design Development (DD)..........................................................8 weeks <br />4.DD Owner review........................................................................3 weeks <br />5.Construction Documents (CD)..................................................12 weeks <br />6.CD Owner/AHJ review*..............................................................6 weeks* <br />7.Bidding........................................................................................5 weeks <br />8.Contract Negotiation...................................................................4 weeks <br />9.Construction Duration...............................................................44 weeks <br />B.*Permitting review times may vary <br />DocuSign Envelope ID: 7B8562A0-AFF8-46FE-BD6D-399B7C6FD049
The URL can be used to link to this page
Your browser does not support the video tag.